This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over 100 so I shortened it to give you just a taste.Please note that the timings for this presentation were different than they are here – there was a presenter who was clicking to the next slide when he was done speaking – here the slides are transitioning automatically, so you might not have enough time to read the entire slide.So when you are ready, just click once to start. Thank you for watching – rose lawless
Project Goals Your Company purchased 6.22 acres on Water Tower Road during the summer of 2007. This will be the new home of the Your Operations Division.
Project Goals Our project goal is to take this location from the current condition of a vacant parcel with a preliminary plan, through design, specifications, site plan approval, permitting, bidding to the various trades, construction, obtaining a Certificate of Occupancy and moving YOUin to a beautiful new facility no later than August, 2009. This goal will be realized through the use of our firm which has the knowledge and proven experience to achieve this goal. WHY OUR COMPANY, YOU ASK???
Procedures PHASE I – SCHEMATIC DESIGN STUDIES PHASE II – DESIGN DEVELOPMENT PHASE III – CONSTRUCTION DOCUMENTS PHASE IV – CONSTRUCTION
Phase II – Design Development • Upon approval of Schematic Designs and owners authorization to proceed: • Development of the concept • Finalize floor plans and elevations • Complete site plans
AUTOCLAVED AERATED CONCRETE + + + = AAC Cement water lime sand
Boynton Pump & Irrigation Corporate Office/Distribution Facility Location: Lake Park, Florida Client: Boynton Pump and Irrigation Designed By: MY COMPANY Size: 40,000 S.F. Features: This facility combines tilt wall construction and a USA Pre-engineered Metal Building System. It contains two (2) showrooms and distribution warehousing with truck docking facilities. Steel Structure during construction COMPLETED PROJECT
Technology - More GREEN! • HEBEL AUTOCLAVED AERATED CONCRETE • INSULATED COMPOSITE WALL PANELS • RECYCLED STEEL STRUCTURE • REFLECTIVE WHITE METAL ROOF • IMPACT WINDOWS • CARPET AND FLOORING • “ENERGY STAR” PRODUCTS • PLUMBING • SHADE TREES/IRRIGATION • HIGH-EFFICIENCY LIGHTING WHAT CAN WE DO TO MAKE YOUR BUILDING GREEN?
RECYCLED STEEL Steel is the most recycled material in North America, according to the Steel Recycling Institute. More than 68 million tons are recycled each year. In fact, all new steel made in North America contains recycled steel.
LANDSCAPING/IRRIGATION OPTIONS Overflow rainfall is collected in silo-like cisterns and used to maintain landscaping. An on-site, constructed wetland and landscaped bioswales cleanse water from the parking area before it leaves the site.
ENERGY EFFICIENT CARPET AND FLOORING 30,000 lbs of crumb rubber from tires A DAY are recycled. 10,000,000 pounds of tires are used per year to produce carpet and flooring.
ENERGY STAR PROGRAM Tax Deductions for Commercial Buildings: A tax deduction of up to $1.80 per square foot is available to owners or designers of new or existing commercial buildings that save at least 50% of the heating and cooling energy of a building that meets ASHRAE Standard 90.1-2001.
HIGH EFFICIENCY ELECTRIC Efficient Fluorescent Lighting WANTED DEAD OR ALIVE. LOW EFFICIENCY HID LIGHTING Earn Rewards Up To $140 Per HID Fixture
WHAT CAN SHADE TREES DO TO HELP SAVE ENERGY? Technology - More GREEN! When shade trees cool a building, such that one unit of air conditioning energy is avoided, 5 to 10 units of primary energy are avoided at the power plant.
Thank you for watching and I hope to work with you in the very near future!Click ESC key to exit.Rose LawlessYour Office On Call