Single Engine Operations

Single Engine Operations. Engine Failure. Standard Strategy Obstacle Strategy. Standard Strategy. In case of engine failure and if no constraining obstacle is found on the route, the AIRBUS ‘Standard strategy’ will be adopted.

nbradley
Download Presentation

Single Engine Operations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Single Engine Operations Single engine operations

  2. Engine Failure • Standard Strategy • Obstacle Strategy Single engine operations

  3. Standard Strategy • In case of engine failure and if no constraining obstacle is found on the route, the AIRBUS ‘Standard strategy’ will be adopted. • It ensures MAX range at the expense of rate of descent and descent ceiling Single engine operations

  4. Single engine operations

  5. In case of engine failure the progress page of FMS presents the LRC ceiling as the REC MAX altitude FL165 Single engine operations

  6. FL 166 Single engine operations

  7. Single engine operations

  8. Ex: Descent from FL330 to FL160 MCT Thrust GW 68 t Result: Fuel 1347-433=914 Kg Time 38-12=26 min Dist 253-72=181 Nm Single engine operations

  9. Single engine operations

  10. Single engine operations

  11. Obstacle Strategy • If constraining obstacles are met on the route after an engine failure, the ‘AIRBUS Obstacle strategy’ (Drift down) will be adopted in order to maintain the highest possible level. • It ensures min rate of descent and max E/O descent ceiling at the expense of range. Single engine operations

  12. Single engine operations

  13. 359 66.5 234 21.7 22000 Single engine operations

  14. 359 66.5 234 21.7 22000 Single engine operations

  15. Single engine operations

  16. Example • Determination of LRC ceiling • Determination of Drift Down Ceiling • Conclusion Single engine operations

  17. Example • DATA • SAT: -36ºC • GW 68 000 kg • FL 330 • MORA : 18 300 ft Single engine operations

  18. DATA • SAT: -36 • GW 68 000 kg • FL 330 • MORA 18300 ft DISA=+15 LRC Ceiling 16600 ft LRC Ceiling 16600 ft As LRC ceiling is below the MORA, the Standard strategy can not be adopted. Single engine operations

  19. DATA • SAT: -36 • GW 68 000 kg • FL 330 • MORA 18300 ft DISA=+15 LRC Ceiling 16600 ft As the Drift Down ceiling (19 800 ft) is above the MORA, the Drift Down Procedure is adopted. 409 75.5 234 25.2 19800 Single engine operations

  20. Procedure • Set MCT on the remaining engine • Decelerate to green dot speed: 234 kt • Then Descend to level off • Set, on FCU green dot speed and pull • A/THR : OFF • Set on FCU Drift Down Ceiling and pull. Single engine operations