1 / 19

Parnassus Heights

Update on Campus Planning and Construction Parnassus and Mission Bay Lori Yamauchi Assistant Vice Chancellor Campus Planning. Parnassus Heights. New Construction and Renovation at Parnassus. MSB/Moffitt Seismic Joint & Retrofit. Cole Hall. M/L-13 Bed Expansion.

neena
Download Presentation

Parnassus Heights

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on Campus Planning and Construction Parnassus and Mission BayLori YamauchiAssistant Vice Chancellor Campus Planning 1

  2. Parnassus Heights 2

  3. New Construction and Renovation at Parnassus MSB/Moffitt Seismic Joint & Retrofit Cole Hall M/L-13 Bed Expansion Kirkham Childcare Center Stem Cell Building 3

  4. Design/Build Project includes: Space for 80 children (5 classrooms) 8,987 GSF / 5,910 ASF $4,374,000 budget Funding source: Chancellor’s Discretionary Funds Projected completion: October 2007 Kirkham Child Care Center 4

  5. Project includes: Located south of HSE and HSW 80,000 GSF $123,000,000 estimated budget Funding sources: gifts and state funds Projected completion: December 2010 Institute for Regeneration Medicine 5

  6. Project involves seismic improvements and space adjustments: $35,400,000 approved budget $17,000,000 in state funds $6,000,000 in FEMA funds $4,400,000 in non-state funds Projected completion: June 2008 MSB/Moffitt Seismic Joint and Retrofit 6

  7. Project involves renovating interior finishes, seating, lighting, and acoustics: $3,222,000 approved budget Funding source: Campus Funds Projected completion: August 2007 Cole Hall Renovation 7

  8. HSW-4 Pathology Remodel: 9,177 ASF $8,355,000 approved budget Projected completion: May 2008 M-3N MRI Suite Renovations: 3,216 ASF $14,955,000 approved budget Projected completion: May 2008 L-13, M-13S Bed Expansion: 20,000 ASF $36,200,000 approved budget Projected completion: February 2008 MSB HVAC Improvements: $34,730,000 approved budget Projected completion: March 2008 Renovation Projects 8

  9. UC Hall decant and demolition: Removal of 146,853 GSF from the space inventory Timetable and Budget TBD Lab of Radiobiology demolition: Removal of 18,219 GSF from the space inventory Timetable TBD Medical Research IV demolition: Removal of 12,252 GSF from the space inventory Timetable TBD Proctor, Surge and Woods demolition: Removal of 25,124 GSF from the space inventory Timetable TBD Parnassus Projects to be completed by 2012 (LRDP Horizon) 9

  10. Housing: Older Aldea housing demolition TBD 1486-88 5th Ave. renovation TBD 374 and 735 Parnassus Ave. replacement TBD Infrastructure Improvements: Electrical Distribution System West side Utilities Telecom / Data improvements Parnassus Projects to be completed by 2012 (LRDP Horizon) 10

  11. Scope: Parnassus Design Guidelines and Campus Plan will address the developed southern portion of the Parnassus Heights campus site located below the Mount Sutro Open Space Reserve Timetable: Design Guidelines Completed Campus Plan to be completed Fall 2007 Parnassus Design Guidelines 11

  12. Goals: To establish a more cohesive appearance To create a stronger identity To introduce more color to the campus To improve navigation and way-finding To ensure pedestrian safety and accessibility To enhance the quality of life on campus Parnassus Design Guidelines 12

  13. Mission Bay 13

  14. Program includes: UCSF Cancer Center, Urology, Neurological Surgery 161,757 GSF / 97,168 ASF $135,000,000 approved budget $91,379,000 in gift funds $13,621,000 in campus funds $30,000,000 external financing Projected completion: Fall 2008 Helen Diller Cancer Research Building 14

  15. Program includes: Cardiovascular Research Institute and other related programs 137,000 ASF / 232,000 GSF $247,000,000 estimated budget Funding sources: gifts, Medical Center funds, external financing Projected completion: June 2011 Cardiovascular Research Building (17 A/B) 15

  16. Project being replanned: Neurologic and Neurodegenerative disease research with Keck Center Neuroscience Size and budget to be determined Possible Developer-built Neuroscience Research Building Phase 1 16

  17. Program includes: First phase of a large Utility Plant to produce high-temperature hot water, chilled water, and process steam for three research buildings $16,400,000 approved budget $10,000,000 external financing $6,400,000 campus funds Mission Bay Utilities and Distribution Phase I 17

  18. Planning underway includes: Land acquisition of the south site is complete Program includes 289-bed hospital for children, women, and cancer services; ambulatory care center; central utilities plant. Parking and faculty offices separately funded. Architect selection and design $1,200,000,000 estimated budget ($500,000,000 in gifts, $600,000,000 in debt, and $100,000,000 other) Projected completion: December 2014 Mission Bay Hospital 18

  19. Mission Bay Phase 2 Site Planning • Planning for: • Street Layout • Infrastructure • Landscaping and Open Space 19

More Related