1 / 7

Progress on ASTON EoI

Progress on ASTON EoI. after the OPTIMIST meeting …. FP6. Research Networking Testbeds are part of FP6 IST programme Addressed by 2 nd IST Call in summer 2003 Deadline fall 2003 Projects to start mid 2004 Available budget 20-30 M Eur. Position wrt G É ANT.

neila
Download Presentation

Progress on ASTON EoI

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Progress on ASTON EoI after the OPTIMIST meeting ….. Valentino Cavalli, TERENA

  2. FP6 • Research Networking Testbeds are part of FP6 IST programme • Addressed by 2nd IST Call in summer 2003 • Deadline fall 2003 • Projects to start mid 2004 • Available budget 20-30 M Eur Valentino Cavalli, TERENA

  3. Position wrt GÉANT • ASTON fits with the future needs of GÉANT • work on 40 Gbps line-speed point-to-point, • 10 GE over long distance, • simple layer2 provisioning (routed and switched), • Bandwidth-on-demand (flexible partitioning, provisioning, GMPLS testing), • integrated IP and Optical management Valentino Cavalli, TERENA

  4. EoIs relevant to ASTON • EoI with similar objectives were submitted by • PSNC • Cisco • Juniper • Alcatel ATRIUM2 • They all would like to join ASTON Valentino Cavalli, TERENA

  5. assets • aston@terena.nl mailing list • TF-NGN Optical Networking sub group • Progresses on BoD braistorming • Progress on long distance experience with fibers • 40+Gbps • … • People willing to lead activities • Contacts with carriers, providers, manufacturers (IP and optical) Valentino Cavalli, TERENA

  6. activities • People willing to lead activities           • BoD: Michal           • 40 Gbit/s: Mauro           • 10 GE: Stanislav           • TF-NGn activity: Victor Valentino Cavalli, TERENA

  7. How to progress further • Leaders find volunteers and produce workplans for optical activities in TF-NGN • Capitalise on the brainstorming been done so far in TF-NGN and ASTON • Look for collaboration from DANTE, NRENs Universities, vendors, carriers etc. • Define who does what • New GÉANT deliverables? • Be ready for FP6 opportunities in 1st or 2nd call Valentino Cavalli, TERENA

More Related