OTIA III State Bridge Delivery Program. There are three basic methods that are being used to deliver the Program. Presented by Deborah Geideman, Deputy Program Manager, BDU. Project Delivery Methods. Region Delivery In house design Outsourced design
E N D
OTIA III State Bridge Delivery Program There are three basic methods that are being used to deliver the Program Presented by Deborah Geideman, Deputy Program Manager, BDU
Project Delivery Methods • Region Delivery • In house design • Outsourced design • Delivery through Oregon Bridge Delivery Partners (OBDP) • Outsourced design through subcontracts • Management of Design through Agency ATAs (Stage 1) • Design-Build
Summary of Delivery • Total “Work” Bridges in the Program = 293 • The bridges have been combined “bundled” into 72 separate projects • 24 Region Delivered Bundles • 34 OBDP Delivered Bundles • 14 Design-Build Bundles
Summary of Program Stages • The 72 bundles are delivered in 5 Stages • Stage 1 – 14 Bundles • Stage 2 – 21 Bundles • Stage 3 – 17 Bundles • Stage 4 – 12 Bundles • Stage 5 – 8 Bundles • All bundles in Stages 1-3 are assigned with the exception of the Willamette River Bridge • There are 10 bundles in Stages 4 & 5 unassigned
Contracts Key Personnel • BDU Beth Enos Procurement Officer E-mail: beth.enos@odot.state.or.us Phone: (503) 986-6632 • OBDP Jim ReynoldsProcurement Manager (Dept. Manager) E-mail: jim.reynolds@obdp.orgPhone: (503) 587-2906 Norine AskSr. Contract ManagerE-mail: norine.ask@obdp.orgPhone: (503) 587-2954
Other Thoughts Resource Handouts: • Office of Project Delivery (OPD) Organization Chart • OBDP/OPD Contact List • Resources for Success in OTIA III State Bridge Program and Beyond • Business/Accounting Survival Tips Website: http://www.oregon.gov/ODOT/HWY/OPD/PersonalServicesContracts.shtml