1 / 12

2004

2004. Baustelle La Planée. Ostereinsatz: Dacharbeiten. Gerüstbau. Das Dachkommando. Abdecken. Reparaturen am Dachstuhl. Sparren ersetzen. Gesims vorbereiten. Auch das gehört zu einem neuen Dach. Und das Wichtigste. OPEN-AIR VOM FEINSTEN.

nelia
Download Presentation

2004

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2004 Baustelle La Planée

  2. Ostereinsatz: Dacharbeiten Gerüstbau

  3. Das Dachkommando Abdecken

  4. Reparaturen am Dachstuhl Sparren ersetzen Gesims vorbereiten

  5. Auch das gehört zu einem neuen Dach

  6. Und das Wichtigste ... OPEN-AIR VOM FEINSTEN !!! Die Dachplatten

  7. 2. Woche: Dach decken

  8. Pfingsteinsatz und Hof pflastern

  9. Gemeinsames Essen mit unseren Nachbarn und Die täglichen Andachten am Morgen

  10. Fertig

  11. Abbaulager

  12. Herbstferien: Winterfest machen ENDE

More Related