Exemption Analytics

This analysis considers non-333 exemptions from June 1, 2016, to May 31, 2017. It examines the average duration and processing times for various stages in the exemption process. Additionally, it provides insights on extension request lead times.

nellr
Download Presentation

Exemption Analytics

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Exemption Analytics

  2. General Analysis Information • Data period - June 1, 2016 to May 31, 2017 • Analysis only considers non-333 exemptions • There were a total of 567 exemptions considered • Completed – 477 • Not Completed 90

  3. General Analysis Information Contd. • Average duration to complete an exemption FAA wide is 78 days. • Average duration of FDMS to Assigned in FAA is 6 days • Average ARM processing time (Draft Decision) is 5 days • Average ARM processing time (Internal Coordination) is 7 days • Average OPR processing time is 22 days • Average Legal processing time is 24 days • Average “lag” time throughout the process is 14 days

  4. Total Number of Non-333 Exemptions for period

  5. Project Duration – All FAA

  6. Project Duration (Detailed) – All FAA

  7. Duration – Date Posted to FDMS to Assigned FAA

  8. ARM Processing Time – Draft Decision

  9. ARM Processing - Internal Coordination

  10. Processing Time by OPR

  11. Extension Request Lead Times • Total of 107 extensions considered for the following chart. • Total of 8 extensions were requested after previous exemption had already expired. • Average lead time provided to the FAA for extensions was 100 days.

  12. Extension Request Lead Times

  13. Extension Request Lead Times (AforA) • Following chart is a result of a small data set. (Only 4 Exemptions) • JVS recommends that we pull a larger data set to get more measurable data to look at for the chart. • Docket Number - FAA-2002-12831 had two separate submissions. Additional information below: • AFS-17-113171-E – submitted 12/8/2016 • AFS-16-11910-E – submitted 5/20/2016

  14. Extension Request Lead Times (AforA)

More Related