An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RTCA SC214/VDLSG Status Update Dongsong Zeng– VDLSG Chair

  2. VDLSG Background • VDL2 Multi-frequency enhancement is needed to support NextGen and SESAR • VDLSG/WG92 work jointly to update the VDL2 standards to include multi-frequency improvements that are aligned with A631-6 • DO-224C (RTCA Minimum Aviation System Performance Standard) • DO-281B (RTCA Minimum Operational Performance Standard) • ED-92B (EUROCAE MOPS) • ICAO Doc 9776 VDL2 Technical Manual

  3. Where we are in RTCA • VDLSG in RTCA Organization Structure We are here PMC Policy Board Board of Director …… SC-216 SC-214 SC-223 VSG CSG VDLSG

  4. VDLSG Schedule A631-6 1/11 A631-5 12/08 MASPS, DO-224C VDLSG Established 3/10 Publication Apprvl12/11 FRAC Resol 10/11 FRAC Rels 4/11 MOPS, DO-281B (ED-92B) Publication Apprvl 3/12 FRAC Rels 10/11 Eurocontrol/SITA Validation 5/11 FRAC Resol 1/12 ICAO Doc 9776 Doc.9776 Edition 2 Review Complete Fall/12 AP # 310 6/12

  5. Key Multi-frequency Improvements • Air - Ground frequencies are separated • Before: CSC, non-CSC • After: CSC, air, ground • When aircraft changes from ground to air, it will switch to an air frequency if it is available, and vice versa. • Frequency support list management is added to MASPS • FSL related test cases are added to MOPS • Autotune is updated for multiple-frequency • Aircraft Requested Ground Initiated handoff is removed

  6. DO-224C MASPS Status • Draft DO-224C • VDL2 multi-frequency is updated to align with A631-6 • Approved for Final Review And Comment in Plenary 12, Berlin, April, 2011 • Received a total of 21 FRAC comments • VDLSG/WG92 collectively resolved all 21 FRAC comments by September 2011 • SC-214 Approved DO-224C in Plenary 13, Paris, September 2011 • PMC approved DO-224C publication in December 2011

  7. DO-281B Status • DO-281B • Aligned with DO-224C and A631-6 • Approved for FRAC in October, 2011 • Received a total of 76 FRACs • VDLSG/WG92 collectively resolved all FRACs by Jan 30, 2012 • PMC publication approval in March 2012 • ED-92B • Technical content same as DO-281B, with different traceability references • Similar publication schedule (EUROCAE Technical Council can approve it at anytime)

  8. ICAO Tech Manual Update • ICAO Doc 9776 VDL2 Technical Manual is the international VDL2 MASPS • Need to align with DO-224C, DO-281B, ED-92B and A631-6 • Amendment Proposal (AP # 310), initiated by Pete Muraca, proposes changes to align tech manual with DO-224C and A631-6 • VDLSG/WG-92/DLK completed review of AP # 310 intended for the ICAO ACP-WG-M-19 meeting in June 2012 • VDLSG/WG-92/DLK plan to complete the review of ICAO ACP WG-M WP05 (Edition 2 to ICAO Doc 9776) before the next ICAO ACP-WG-M-20 meeting in the Fall of 2012

  9. Key Issues for Future VDL2 Standard Update • During the VDL2 MASPS and MOPS update, we found a list of issues that need improvements in the future VDL2 standards update • Key issue areas • Frequency support list usage • Interactions between handoffs • Autotune response options • Means to reduce the use of poor SQP • Clarifications on missing and/or invalid parameters

  10. Joint DLK/VDLSG/WG92 Work Plan • Continue supporting ICAO ACP WG-M for VDL2 standards update • Keep tracking multi-frequency issues arising from validation and operation • Start preparation for potential solutions • Contribute to AEEC VDL2 related standards update • Opening RTCA documents for revision is a decision for the PMC to make • Coordinate with DLK, FAA, SC-214, WG-92, and ICAO to work on next round MASPS and MOPS update once it is opened • The pace of meetings should be driven by the workload • RTCA SC-214 VDLSG will update its Terms of Reference to reflect this work plan

  11. Thank you – Questions?