1 / 23

Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006

Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006. P. Wizinowich for NGAO Executive Committee. Welcome - Participants. In-Person Participants NGAO Executive Committee: Rich Dekany, Don Gavel, Claire Max, Peter Wizinowich

neveah
Download Presentation

Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Next Generation Adaptive OpticsMeeting #2CaltechNovember 14, 2006 P. Wizinowich for NGAO Executive Committee

  2. Welcome - Participants • In-Person Participants • NGAO Executive Committee: Rich Dekany, Don Gavel, Claire Max, Peter Wizinowich • Sean Adkins, Antonin Bouchez, Ian Cameron, Mike Ireland, Anna Moore, Chris Neyman, Viswa Velur • Telecon Attendees: • Brian Bauman, Ralf Flicker, Erik Johansson, Franck Marchis, David Le Mignant, Mike Liu NGAO Meeting #2

  3. Goals of Today’s Meeting • Introduce team structure & responsibilities • Review System Requirements document • Review key drivers for NGAO performance budgets • Review Keck Interferometer requirements • Review instrumentation study strategy NGAO Meeting #2

  4. Meeting Agenda 08:30 Welcome & Introductions 09:00 Management Report (Wizinowich) 09:30 Science Requirements Document (Max) 10:30 Break 10:45 Key Performance Drivers (Dekany) 12:15 Lunch 13:00 LGS Asterism Geometry & Size (Flicker) 13:30 Fixed vs Variable LGS Asterism (Velur) 14:00 Keck Interferometry Requirements (Neyman) 14:30 NGAO Instrument Study Strategy (Adkins, Moore) 15:45 Break 16:00 Discussion: Upcoming tasks & milestones (Wizinowich) 16:30 General Discussion 17:30 Adjourn NGAO Meeting #2

  5. NGAO System Design Phase Management Report P. Wizinowich for NGAO Executive Committee

  6. Presentation Sequence • System Design (SD) Phase Systems Engineering Management Plan (SEMP) + Approval Status + Budget • Management Tools • WBS & tracking • Milestones • Work scope planning & approval • Document management • Science Requirements & Performance Budget Process NGAO Meeting #2

  7. Systems Engineering Management Plan • Document describing how the Executive Committee (EC) plans to manage the SD phase • http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/SystemDesignPhasePlanning NGAO Meeting #2

  8. System Design Phase Approval Status • SEMP submitted to the Observatory Directors on 9/29/06 for approval • Official response not yet received (has been requested) • Major issue is how many $ can be made available in FY07 • Direction from WMKO management to proceed while decision is being made • Contracts (effective 10/1/06) to COO & UCSC need to be worked out NGAO Meeting #2

  9. NGAO SD Phase: Budget $163 increase in cost of labor. Total work same as in proposal. NGAO Meeting #2

  10. SD Phase - Work Breakdown Structure Each major WBS produces one of the 4 major deliverables of the SD Phase: 1 System Design Phase Management  System Design Report 2 System Requirements  System Requirements Document 3 System Design Approach  System Design Manual 4 Systems Engineering Management Plan • Systems Engineering Management Plan WBS dictionary defines each element in WBS NGAO Meeting #2

  11. WBS 1 SD Phase Management 1.1 Planning & Contracting 1.2 Meetings 1.3 Tracking & Reporting 1.4 Proposals & Fundraising 1.5 System Design Report & Review NGAO Meeting #2

  12. WBS 2 System Requirements 2.1 Science Requirements 2.2 Observatory Requirements 2.3 System Requirements Document NGAO Meeting #2

  13. WBS 3 System Design Approach 3.1 Systems Engineering 3.2 AO System 3.3 Laser Facility 3.4 Operations Tools 3.5 Science Instruments 3.6 System Design Manual NGAO Meeting #2

  14. WBS 4 System Engineering Management Plan 4.1 Project Plan 4.2 Risk Assessment & Management Plan 4.3 Preliminary Design Phase Plan 4.4 Integration & Test Plans 4.5 Configuration Management Plan 4.6 Project Management Plan 4.7 Systems Engineering Management Plan NGAO Meeting #2

  15. System Design Phase Tracking • Tracked version of the plan posted at http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/SystemDesignPhasePlanning NGAO Meeting #2

  16. NGAO SD PhaseMilestones NGAO Meeting #2

  17. Team Meeting Calendar NGAO Meeting #2

  18. Work Scope Planning & Approval • Template posted at http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/WebHome under “Systems Engineering” • To be prepared by WBS element lead & approved prior to performing significant work on a WBS element • In general these should be submitted at least 1 week prior to the MS Project start date • Approvals & document control by Dekany & Wizinowich • We will endeavor to provide approvals within 5 working days of submittal NGAO Meeting #2

  19. Document Control • All materials to be posted on Twiki site • All significant items should be made Keck Adaptive Optics Notes & will also be archived on Keck’s docushare site (Wizinowich to provide KAON numbers) • Simple documents can use “Work Scope” template with “Keck Adaptive Optics Note XXX” at top of title block • SD phase deliverable documents should use SEMP document as a template NGAO Meeting #2

  20. NGAO SD Phase:Science Requirements & Performance Budget Process NGAO Meeting #2

  21. NGAO System Design Phase Upcoming Tasks & Milestones P. Wizinowich for NGAO Executive Committee

  22. Upcoming Tasks • Work Scope planning sheets • These should be submitted for all WBS elements that need to start in CY06 by 12/8 • These include WBS elements under: • 2.1 Science cases • 2.2 Observatory requirements • 2.3 System requirements • 3.1.1 Performance budgets • 3.1.2 Trade Studies • 3.5 Science Instruments • Work on the scheduled WBS elements for CY06 NGAO Meeting #2

  23. Upcoming Meetings & Milestones • Meeting #3 is a Dec. 13 telecon • http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/061213_Remote_NGAO_Meeting_3 • Will need % complete for WBS elements prior to meeting • Milestones: • SD phase contracts in place was due 10/27 • Science requirements summary v1.0 was due 10/27 • System Requirements document v1.0 due 12/8 NGAO Meeting #2

More Related