260 likes | 840 Views
AREVA T&D at a glance. Updated March 2009. Content. AREVA Group overview AREVA T&D overview AREVA T&D in China. Energy: our core business. Enrichment. Fuel fabrication. Renewable energies. Reactors. Chemistry. Recycling MOX fuel fabrication. Mining. Used fuel treatment. Services.
E N D
AREVA T&D at a glance Updated March 2009
Content • AREVA Group overview • AREVA T&D overview • AREVA T&D in China
Energy: our core business Enrichment Fuel fabrication Renewable energies Reactors Chemistry Recycling MOX fuelfabrication Mining Used fuel treatment Services Transmission OTHER SOURCESOF ELECTRIC POWER Distribution Front End Division Reactors and ServicesDivision Back End Division Transmission & DistributionDivision
AREVA: a recognized leader • World leader in energy business • No. 1 in the entire nuclear cycle • One of the top three players in power transmission and distribution • Mission of the Group • Innovate to contribute to ever safer, cleaner and economicalCO2-free power generation and electricity transmissionand distribution • 2008 sales: Over €13.1B • 75,000 employees
Content • AREVA Group overview • AREVA T&D overview • AREVA T&D in China
Transmission and Distribution (T&D) represents one third of AREVA turnover Transmission & Distribution
Robust growth through mergers & acquisitions Acquisition of Sprecher & Schuh Acquisition of Cegelec - T&D Alsthom 1983 1988 1996 Acquisition of Waltec & RB Watkins 2004 Acquisition of RITZ High-Voltage 1928 1986 1998 2007 Merger with GEC Acquisition of CEM Acquisition of AEG 2008 2006 Acquisition of Passoni & Villa; Nokian Capacitors Alstom T&D becomes AREVA T&D
Employees >25,200 • 2008 sales €5.08B Strong global presence Full portfolio of power transmission and distribution solutions to support utilities and electro-intensive industries eg power generation, rail transport, oil & gas, metals & mining
Our businesses PRODUCTS SYSTEMS AUTOMATION SERVICE • Network Consulting • Erection & Commissioning • Maintenance & Repair & Retrofit • Spare Parts • Training and Expertise • Customer Solutions • Asset Care • 40 service centers • HV Switchgear • Power and Distribution Transformers • Measurement Transformers • MV Switchgear • 54 sites in 25 countries • Turnkey Transmission Projects • Turnkey Distribution Projects • Power Electronics • 29 sites in 26 countries • Products • Systems • Support • 3 competence centers • 7 product assembly sites • 18 engineering centers
Complete T&D solutions Products Generator Circuit Breakers Power Transformers Instrument Transformers Gas-Insulated Substations Circuit Breakers Disconnectors Primary Distribution Secondary Distribution Distribution Transformers Systems Substations Power Electronics Power Distribution Automation Automation Products Automation Systems Automation Support Service Maintenance & Repair Erection & Commissioning Spare Parts Total Asset Care Training & Network Consulting Retrofit
Leadership positions EMS • Disconnectors • HVDC* High Voltage Direct Current • GIS Energy Management Systems Gas-Insulated Substation • SPS Aluminum • Instrument Transformers *Excluding China Special Product Suppliers
GIS F35-5 bay MS 3000Monitoring Power transformer PACiS 4.5 Expanding product portfolio MaxSine SVC 100% Vegetable oil Power Transformer Top core Current Transformer PIX High for Nuclear Segment
PRODUCTS R&D expenditures (M€) 250 200 200 X 2 150 115 115 100 AUTOMATION 50 0 2005 2006 2007 2008 2009 2010 R&D / sales Average R&D / sales 3.3% 4% Existing products New products Accelerating R&D investmentto differentiate through innovation Source: AREVA
Content • AREVA Group overview • AREVA T&D overview • AREVA T&D in China
Historical overview JV with Sunten 3 DSC JVs JV with Huadian Wuxi & Yangzhou GIS JVs New PTR factory Partnership with CEPRI PRT JV with Shanghai Electric RMC in Shanghai ITR ASPA in Shanghai Automation ASX and AVX in Xiamen PDS SAS in Suzhou PDS&SDS 2007 2001 2003 2006 2002 1992 2007 & 2008 SHT in Suzhou GIS AST in Shanghai PTR SHV in Suzhou CBR Long-time presence and accelerating expansion since 2000
AREVA in China • More than 3,000 employees (including minority JV) • Over 2,800 employees for T&D • AREVA locations in China • AREVA Beijing Consulting, WOFE, AREVA’s headquarters in China • 12 T&D sales offices • 13 T&D manufacturing sites • 4 offices for nuclear business + project teams • 2 JVs for nuclear business • More than €735M sales¹ in 2008 • Nuclear business: €370M • T&D business: €365M • T&D investment in China • More than €288M 1Sales by destination in 2008 (not including the products manufactured in China and exported overseas)
China Technology Center • Located in Shanghai & already started operation • Initial investment is RMB180 million, with 350 local Chinese R&D engineers and specialists to be recruited by 2012 • Strong focus on activities in which China is a global leader • UHVDC and UHVAC • Cultivate closer relationships with academic and industrial partners, and tap potential talents • Support T&D`s Chinese Centres of Competence • Be our Asian testing centre • 1200 kV AC • 800 kV DC (no MVU-tests) • Training center and workshop
Key references in China • 500kV power transformers • Shanxi EPC Yuncheng Substation • Shanghai EPC Yanggao Substation • Daya Bay and LingAo Nuclear Power Plants • GIS • 500kV underground substation for 2010 China Expo in Shanghai • 550kV GIS for Beijing EPC Haidian project • 500kV GIS for Huizhou pump storage power plant in Guangdong • Medium voltage switchgear • Shanghai Metro Line 8 & 9 Phase II project • Hangzhou Metro Line 1 • Chengdu Metro Line 1 • Disconnectors • Leading player in China
Key references in China • Automation • e-terraVision for North China Grid • About 500 sets of line differential protection P540 used in 500kV • Instrument transformers • Bushing for SGCC’s first 1100kV transmission line • Circuit breakers • More than 8,000 installations of Live Tank circuit breakers installed in China with zero failures during operations • 2008 Beijing Olympics • HVDC & FACTS • Ningdong-Shandong HVDC link • Three Georges HVDC Project (Gezhou Dam to Shanghai) • Sino-Russia Back to Back grid connection in Heilongjiang province • Systems • Turkey project/substation for Michelin’s new plant in China
AREVA T&D Your partner for success 22 22