1 / 13

Previously,

Previously,. a t Bolides 2009 Prague. Sky-plane probability distribution for impactors 30 days before impact. with V < 22.7 and apparent motion < 12 deg/day. Veres et al. ( 2009). Sky-plane probability distribution for 3 meter diameter impactors (bolides) 1 day before impact. 2008 TC 3.

nevin
Download Presentation

Previously,

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Previously, at Bolides 2009 Prague...

  2. Sky-plane probability distribution for impactors 30 days before impact with V < 22.7 and apparent motion < 12 deg/day Vereset al. (2009)

  3. Sky-plane probability distribution for 3 meterdiameter impactors(bolides) 1 day before impact 2008 TC3 with V < 22.7 and apparent motion < 12 deg/day Vereset al. (2009)

  4. impactor discoveries in a4 year PS1 survey mission Vereset al. (2009) 1 night tracklet 3 night orbit

  5. impactor discoveries in a4 year PS1 survey mission Vereset al. (2009) So how did CSS find 2008 TC3? • they got ‘lucky’ or • there are more small impactors than expected or • something is wrong with our simulation 1 night tracklet 3 night orbit

  6. A • John Tonry, PI • 8 telescopes and cameras • 25cm aperture, f/2.8, 5° FOV, 20 deg2 • 4x4k pixels at 4.4”/pix • 30s exp, 4s readout, 10e- read-noise • Sensitivity at SNR=5 • V=19.3 1 telescope, 1 exp, red & blue • V=20.0 4 telescope, 4 exp, red & blue • Deployment • 2 pairs x 2 pointingsx 2 sites • “blue” (g+r) and “red” (r+i) filters • 2 observations of 20,000 deg2/night STEROID T ERRESTRIALIMPACT L AST A LERT S YSTEM

  7. A STEROID T ERRESTRIALIMPACT L AST A LERT S YSTEM

  8. A STEROID T ERRESTRIALIMPACT L AST A LERT S YSTEM

  9. A Ironwood Observatory STEROID T ERRESTRIALIMPACT L AST A • portable • robotic • autonomous LERT S YSTEM

  10. A • Cost • ≈ $2M construction for 2 sites • ≈ $0.5M/year operations • ≈ $1Mincremental/site • Time • 2 years from start of funding STEROID T ERRESTRIALIMPACT L AST A LERT S YSTEM

  11. A • Asteroid collisions • 10m MB asteroid disruption/day • 100m MB asteroid disruption/year • 1000m dust cloud visible in MB • Light curves • ~400 photometric observations/yearfor ~105asteroids • Bolides • Onebolide like 2008 TC3 per year STEROID T ERRESTRIALIMPACT L AST A LERT S YSTEM

  12. A T L ATLASwill identify>60% of allimpactors A S

  13. A STEROID T ERRESTRIALIMPACT L AST A LERT S YSTEM

More Related