1 / 4

WG on HTHP Rheology – Summer 2013, Washington DC

WG on HTHP Rheology – Summer 2013, Washington DC. Deryck Williams – Chairman Rick Lukay – WG Lead. CHARGE.

neylan
Download Presentation

WG on HTHP Rheology – Summer 2013, Washington DC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WG on HTHP Rheology – Summer 2013, Washington DC Deryck Williams – Chairman Rick Lukay – WG Lead

  2. CHARGE Develop a technical report on recommended testing protocols for measuring HTHP rheology of cement slurry (temperatures greater than 190F and/or pressures greater than atmospheric pressure) with the intention of the report serving as the basis for a NWI.

  3. Action Items from New Orleans • Re-do round robin testing. • Collect and compile all test data for Washington DC. • Conduct another cement slurry round robin testing if required.

  4. Current Status • Due to the Chairman’s work/travel schedule Rick Lukay has been assisting and has volunteered to lead the WG. • The cement slurry design developed by Chevron (Ronnie Williams – ETC, Cement Lab) was shipped and tested.