170 likes | 197 Views
CAL DQM Report. June 2 nd – June 9 th. June 2 nd Upadate B.C’s. Checkout Runs: QINJ 17966 0(0) 12(1) 1(0) UNO 17967 0(0) 1(0) 0(0) PED 17968 0(0) 0(0) 0(0) Version 3587 311 b.c.’s 2 holes (B2,B22) Updated UNO scale factors.
E N D
CAL DQM Report June 2nd – June 9th
June 2nd Upadate B.C’s • Checkout Runs: • QINJ 17966 0(0) 12(1) 1(0) • UNO 17967 0(0) 1(0) 0(0) • PED 17968 0(0) 0(0) 0(0) • Version 3587 311 b.c.’s 2 holes (B2,B22) • Updated UNO scale factors
Total number of CAL bad channels for version 3587 is 311 They break down as follows: FCAL BCAL RCAL Total FEC 28 3 4 35 UNO 75 124 25 224 Qinj 12 16 2 30 PED 17 5 0 22 Total 132 148 31 311 The total number of holes in the CAL are: Ca Crt Crd Chn Poser Mod Tow Typ Sid Code Message b 15 5 18 4262 2 7 1 0 3005 DSP Qinj mean too low b 15 5 24 4263 2 7 1 1 4001 UNO mean is high b 5 7 3 6A34 22 4 2 0 4006 UNO RMS is too big b 5 7 9 6A35 22 4 2 1 4005 UNO mean is too low 2 holes Total number of SRTD bad channels for version 3587 is 5 Ca Crt Crd Chn PMT Code Message r 6 14 1 944 22 Pipeline pedestal spread r 6 14 2 958 65 Nonlinearity r 6 14 3 96C 22 Pipeline pedestal spread r 6 14 4 980 65 Nonlinearity r 6 14 11 8EA 65 Nonlinearity Total number of FNC bad channels for version 3587 is 0 Total number of PRES bad channels for version 3587 is 1 Ca Crt Crd Chn PMT Code Message r 11 2 43 10E0 65 Nonlinearity Total number of PRT bad channels for version 3587 is 0 Total number of LED bad channels for version 3587 is 0 Total number of BPRE bad channels for version 3587 is 0 Total number of TDI bad channels for version 3587 is 0 Version 3587
June 3rd Access day • FEC • EC-1 EC-5 17999-18004 • FEC v. 3588 74 b.c.’s 0 holes • Update time offsets v. 208 • UNO 18007 71(0) 273(81) 31(0) B26 off! • calhvon • UNO 18008 75(0) 119(0) 30(0) B26 on!
June 3rd continued • Trimming • UNO 18011 75(0) 118(1) 30(0) • UNO 18012 53(0) 117(0) 25(0) • UNO 18013 48(0) 113(0) 25(0) • UNO 18014 50(0) 113(0) 24(0) • QINJ 18015 7(0) 3(0) 2(0) • PED 18016 24(0) 8(0) 1(0) • Version 3590 290b.c.’s 0 holes • Update UNO scale factors
June 4-8th • Isabell used CAL quick calibs to update b.c’s • Isabell did Auto ADC to volt on Monday.
June 9th • Update b.c’s with CAL quick calib 50218 • QINJ 0(0) 0(0) 0(0) • UNO 0(0) 4(0) 2(0) • PED 1(0) 0(0) 0(0) • Version 3598 307 b.c.’s 0 holes • Tried to change version, got errors: • ccv: could not get lock: file /var/tmp/locks/ccv.lock already exists • Didn’t change version, didn’t main
Total number of CAL bad channels for version 3598 is 307 They break down as follows: FCAL BCAL RCAL Total FEC 34 36 4 74 UNO 53 121 26 200 Qinj 8 4 3 15 PED 13 5 0 18 Total 108 166 33 307 The total number of holes in the CAL are: Ca Crt Crd Chn Poser Mod Tow Typ Sid Code Message 0 holes Total number of SRTD bad channels for version 3598 is 1 Ca Crt Crd Chn PMT Code Message r 6 14 11 8EA 42 Pipeline gain spread Total number of FNC bad channels for version 3598 is 0 Total number of PRES bad channels for version 3598 is 1 Ca Crt Crd Chn PMT Code Message r 11 2 43 10E0 65 Nonlinearity Total number of PRT bad channels for version 3598 is 0 Total number of LED bad channels for version 3598 is 0 Total number of BPRE bad channels for version 3598 is 0 Total number of TDI bad channels for version 3598 is 0 Version 3598
Problems/Calls from ZCR • June 3rd 11:30 pm • Slow control warnings • SRTD-FLTvolt south channel 4 • Fixed by logging into teucer and using command: srtdfltlv on/ srtdfltlv off until all the voltages looked normal • Pow_CAL in RCAL, BCAL etc. • Ping monitor shows hc3control is unreachable • Go to 6th floor and reset computer • June 6th 8:30 pm • Slow control problem with PRES-deputy missed instructions to email Isabell
Problems/calls continued • June 7th • GFLT histos show CAL pipeline jump • Called Allesandro, called John L. (this is a CFLTP prob.) • June 9th • Cal in undefined offline state, can’t include CAL in runs. Called Allesandro
DQMCOC Trouble getting plots off caldaq…