DQM system status. F. Bellini for the DQM core DQM meeting, 04 th October 2012. Outline . Last DQM meeting 04 th September 2012: https:// indico.cern.ch / conferenceDisplay.py?confId = 203803 Minutes:
E N D
DQM system status F. Bellini for the DQM core DQM meeting, 04th October 2012
Outline Last DQM meeting 04th September 2012: https://indico.cern.ch/conferenceDisplay.py?confId=203803 Minutes: https://indico.cern.ch/getFile.py/access?resId=minutes&materialId=minutes&confId=203803 • System status • Feedback from pA pilot run • Detectors software status • DQM shifts and training • On-call training DQM status
System status • Latest news from P2: • No major problems with DQM framework • System is running smoothly • Software updated regularly (thanks Adriana and Barth) • Occasional crashes of T00QA, frequent crashes of ZDC01 both under investigation by experts • Implementation of thresholds – status: • All detectors have thresholds and automatic checks except PMD • QAchecker still to be implemented by PMD, TRD*(presentation today) • Propagation of quality flags to GUI color box • SSD, EMC, SPD need to check and debug propagation of quality flags • T0, MTR do not have the color box • Shifts and training see dedicated slide DQM status
Feedback from pA pilot run Run 188359 of the 13/09/2012 Thanks to Mihai! DQM status
Feedback from pA pilot run • Pilot pArun on 12-13/09 • System run smoothly • no new plots were implemented • dedicated general GUI layout created for the long pA data taking • event size values recorded as reference for the long pA • Screenshots taken during pA for each detector have been sent to the DQM responsibles Available information to already set thresholds and prepare documentation before the long pA • What’s next all detectors have to: • Make all the necessary changes to the software before the pA • Add a chapter in the documentation with reference for the pA run + screenshot • Preparation for pA:DEADLINE 04/12/12 DQM status
Detector software status - overview Ok In progress Not done Does not apply Waiting for porting * = duplication required in the past, not used now H = splitting requested for A-A, p-A DQM status
DQM shifts and training EOS report • subsystem not selected on the EOS reports subscribe to the alice-dqm-contact-eos@cern.chmailing list to receive EOS report • Crash logs are now attached to EOS reports • Regular cleanups of “former issues” established • Blackboard cleanup every Friday by DQM on-call established Training • 5 general training sessions / 125 people attending • Strict policy for DQM training and test has helped better trained shifters • Next shifters training not planned – there are no more people to be trained that will have shifts before the end of the year • We need more on-call people please volunteer!!! • We will have soon an on-call training DQM status
DQM shifts booking and shifts during pA Shift booking • Shifts booked till the end of the year • IMPORTANT change of policy by RC: shifts cannot be released anymore by user nor SRC: need to find a substitute if cannot attend Shifts during pA • Limited duration of pArun (24 days total) • RC will open pA shifts for System Coordinators to complete • Request for very experienced, very best shifters • list of possible shifters for DQM ready • the same from the offline side ? • Call to sub-systems for recommendations DQM status
DQM on-call training • Doodle will be set to collect • name of the participants • preferences for the date • Expected duration 2h • Room at CERN + EVO available • Detector DQM experts (and volunteers) • are kindly invited to the • first DQM on-call training • during the last 2 weeks of october DQM status
AOB DQM status
https://twiki.cern.ch/twiki/bin/viewauth/AliceEVE/AliceDQM DQM status
Status of DQM documentation OkNot ok Does not apply In progress X = not monitored DQM status