1 / 18

Fuels, Chemicals & Packaging Procurement

Fuels, Chemicals & Packaging Procurement. Major fuels & Chemicals procured. Fuels (Total spend: Rs. 37500 Lacs ) Coal Lignite Coke Coke breeze Binder Chemicals (Total spend: Rs. 2000 Lacs ) Ammonia Sodium Sulphide liquid Caustic Soda Lye HCL Water treatment chemcials.

Download Presentation

Fuels, Chemicals & Packaging Procurement

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fuels, Chemicals & Packaging Procurement

  2. Major fuels & Chemicals procured • Fuels (Total spend: Rs. 37500 Lacs) • Coal • Lignite • Coke • Coke breeze • Binder • Chemicals (Total spend: Rs. 2000 Lacs) • Ammonia • Sodium Sulphide liquid • Caustic Soda Lye • HCL • Water treatment chemcials

  3. Focus Areas • Ensuring continuous supply of material, for daily consumption • Bulk material supply heavily depends on transport conditions and availability of suitable vehicles • Pre planning of material during festival seasons has to be ensured • Stock situation has to be reviewed on daily basis – to avoid stock outs as well as excess supplies • Market price trends and interdependence of commodities has to be closely monitored • Constant followup required to maintain stock conditions – Contact has to be maintained at various levels for the purpose • Close coordination with users at plant for timely unloading of material

  4. Overview of Fuels Procurement

  5. Spend mix - fuels

  6. Coke • Annual Spend: Rs. 4500 Lacs • Quantity Procured: 25000 MT pa • Purpose: Used in LimeKiln for Limestone burning • Period of Usage: Mostly during monsoon • Type: High GCV Coke (6800 GCV) • Challenges: • Stringent quality requirements • High fluctuation in prices due to international coking coal prices • Sources: 5 suppliers (Preferred – Mahashakti & BLA Coke) • Procurement Pattern: Seasonal (Apr to Sep – Single contract) • Takeaway from recent contract • Continuous feedback on international pricing parity, helped in better negotiations

  7. Coke Breeze • Annual Spend: Rs. 8000 Lacs • Quantity Procured: 75000 MT pa • Purpose: Used for briquetting and then in Lime Kiln for Limestone burning • Advantage: High cost saving as compared to Coke • Period of Usage: Other than monsoon • Quality: 0 to 4 mm size (5500 GCV) • Challenges: • Stringent quality requirements in terms of size & moisture content • High fluctuation in prices due to international coking coal prices • Availability is dependent on coke consumption in other industries viz. Steel manufacturing • Sources: 5 suppliers (Preferred – Mahashakti & BLA Coke) • Procurement Pattern: Other than monsoon (Single contract) • Likely to be used during monsoon post commissioning of briquette drier unit • Takeaway from recent contract • Depending on market situations, feasibility to switch over between coke and coke breeze to be analyzed

  8. Binder • Annual Spend: Rs. 1500 Lacs • Quantity Procured: 4000 MT pa • Purpose: Used for coke breeze binding, to produce coke briquette • Period of Usage: Other than monsoon • Quality: Pregelitised Starch Binder, to pass absorption test • Challenges: • Stringent quality requirements in terms of absorption test • High fluctuation in prices due to maize starch prices • Till previous season only Anil Ltd. was approved supplier • Sources: 3 suppliers (Since current season) • Procurement Pattern: Other than monsoon (Single contract) • Likely to be used during monsoon post commissioning of briquette drier unit • Takeaway from recent contract • Reduced dependence on single supplier by developing new suppliers to ensure uninterrupted material supply at competitive price

  9. Coal & Lignite • Purpose: Used in boiler as fuel • Presently Coal procurement is being handled from Noida office • Captive Lignite mines are operated by GHCL and mining contract is assigned to Ahmedabad based contractor • Lignite purchase is being handled by separate team

  10. Overview of chemicals Procurement

  11. Spend Mix - Chemicals

  12. ammonia • Annual Spend: Rs. 1100 Lacs • Quantity Procured: 3000 MT pa • Purpose: Used in SA manufacturing process • Challenges: • Highly hazardous material • High fluctuation in price depending on availability & import price • Limited storage capacity at plant + under utilization of available capacity • Material unloading at plant • Sources: 2 suppliers • Procurement Pattern: Quantity contract

  13. Sodium sulphide (Liquid) • Annual Spend: Rs. 550 Lacs • Quantity Procured: 1200 MT pa (on 100% basis) • Purpose: Used in SA manufacturing process to maintain SA quality • Challenges: • Highly hazardous material • Prices depends Caustic lye & sulphur price • Material availability • Material unloading at plant • Sources: 3 suppliers • Procurement Pattern: Quantity contract • Take away: • Stock of Sodium sulphide (flakes) is always maintained at plant as backup incase of scarce availability of Na2S (Liq) • Development of additional transporter

  14. Caustic Soda Lye & HCL • Purpose: Used in resin cleaning for DM plant • Sources: Aditya Birla (Indian Rayon) / GACL • Challenges • Aditya Birla being close to plant becomes most preferred supplier due to transportation cost – At time supplier takes location benefit • Pricing depends on demand – supply conditions • Take away • Avoid dependence on single source and continue procurement from alternate source (if required at differential price) • Attempt to have data regarding import scenario of Caustic soda lye

  15. Overview of Packaging Material Procurement

  16. Spend & Volume Mix - Packaging

  17. Packaging Material • Annual Spend: Rs. 2500 Lacs • Quantity: 110 Lacs bags pa • Purpose: Packing of LSA & DSA • Challenges: • Mismatch between Production, Sales and bagging plan • Labour intensive manufacturing – hence sudden demand variation cannot be catered • Careful preplanning required during festival season • Sources: 3 + 2 suppliers • Procurement Pattern: Monthly contract based on sales plan • Take away: • Ensuring 15-20 days inventory at plant • Close monitoring of stocks on daily basis

  18. Thank You

More Related