1 / 22

Converting from Spectrum Management System to Spectrum NG

Converting from Spectrum Management System to Spectrum NG. Thursday, November 19, 2009, 2:30 – 3:25p, Cottonwood Scott Wimberley , Project Manager. Agenda. Introduction Project Champion System Differences New Modules Hardware Requirements Hardware Diagram Implementation Process

nicola
Download Presentation

Converting from Spectrum Management System to Spectrum NG

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Converting from Spectrum Management System to Spectrum NG Thursday, November 19, 2009, 2:30 – 3:25p, Cottonwood Scott Wimberley, Project Manager

  2. Agenda • Introduction • Project Champion • System Differences • New Modules • Hardware Requirements • Hardware Diagram • Implementation Process • Data Conversion • Preparing for Spectrum NG • Questions and Answers

  3. Introduction • Spectrum NG • Multi-tier, Scalable, Multi-site application • Microsoft.Net and SQL 2005 64-bit technology • Hosted vs. Deployed

  4. You Need A Champion • A Project Manager who will take charge of all communication and tasks. • Someone who will work through solutions to implementation scenarios, issues. • Someone to be responsible at the facility to make sure all transitions operate smoothly, and who has the authority to do so as well. • Someone who can coordinate the training dates and onsite consultations.

  5. System Differences • Single Application Shortcut • Automatic Updates • PCI Compliance • Dynamically Created Menus • No A/P – G/L Module • No Tejas Module • Do have Grill Mode and Open Ticket, however • No Fitness Module

  6. New Modules • Event Manager • POS Blind Close • Case Management • Member Card Designer • Query Builder • Application Programmer Interfaces

  7. Hardware Requirements (Hosted) • Workstations • .Net Framework 2.0 • 1.3 Ghz Processors • 256MB RAM • 9GB Free Hard Drive Space • Windows XP Professional with latest Service Packs or Windows Vista or Windows 7 • Bandwidth • Minimum of 768 Kbps

  8. Hardware Requirements (Deployed) • Workstations • Same as Hosted • Bandwidth (to servers) • Same as Hosted • Application Server • Windows Server 2003 (32 bit) • .Net Framework 2.0 with all service packs • Dual 1 GHz Pentium PIII Xeon Processors/Single 2.8 GHz Pentium Processor or equivalent • 1GB ECC RAM • 36GB Free HD Space

  9. Hardware Requirements (Deployed) • Database Server • Recommend different box than Application Server • Windows Server 2003 (32 or 64 bit) • .Net Framework 2.0 with all service packs • Dual 1 GHz Pentium PIII Xeon Processors/Single 2.8 GHz Pentium Processor or equivalent • 1GB ECC RAM • Level 1 RAID with 2 36GB Hard Drives (SCSI) (OS and SQL Transaction Logs) • Level 5 RAID with 3 36GB Hard Drives (SCSI) (SQL Database) • MS SQL Server 2005 Client Licenses (or Processer License if > 25 users)

  10. Implementation Process • Contact Toni Grafner or Randy Cruz for a proposal • Agree to proposal • Larry Rook will contact you to start the process • He will schedule your on-site training & conversion • We recommend a minimum of 4-5 on-site training days • He will work with you on your custom contract & G/L Interface

  11. Account Managers ToniGrafner Randy Cruz Eastern North America Western North America

  12. Implementation Process Continued • Consultant On-Site • Training on Administrative Setup • Training on basic procedures • Converted data will be imported • Assists in the Go-Live

  13. Data Conversion • Nearly everything can be converted • Cannot convert: • G/L Transactions • Tejas Setups • Lockers (Locker Assingments can convert if you use the same locker #s) • Scheduler/Spa/Facility (yet)

  14. Data Cleanup • Here’s your chance to clean up unwanted data. • Before the data conversion, make sure all: • Terminated employees are labeled so. • Unused products are labeled Inactive. • Inactive members are labeled as such. • Old membership types have no members tied to them. • Make a list of the areas that you want to have deleted and let CSI know about it.

  15. Preparing for Spectrum NG • Implement new AP/GL Package • Ensure that your CC Merchant Account is with one of the following: • VISANET/VITAL • NOVA • Paymentech Tampa • First Data North/CardNet

  16. Credit Card Processing • SpectrumNG uses RiTA software to send CC transactions to your processor. • If you are not currently setup for RiTA, then it is necessary to change. • Speak with your Merchant Provider, inform them of the move to a new software. • Your Merchant Provider will generate a setup form for you with one of the 4 processors supported by SpectrumNG.

  17. Credit Card Processing • Submit the setup form to CSI • Larry Rook, Implementation Mgr • Once CSI receives it there is a 2-week processing time. • CSI will respond with your Merchant Number and RiTA ID Number, and instructions to put in SpectrumNG. • Remove and reattach the credit card payment types to ensure the transactions are going to the right bank, then reset Payment Shortcut Keys. Perform a $.01 test transaction to verify everything is working.

  18. Educational Services • It’s FREE! • www.csisoftwareusa.com/training/online.php • Sign up for a username and password • The E-Learning Library is available to train your employee staff at your discretion. • Live Webinars are offered by professional instructor. • Ask questions and get answers • Discuss your issues with other clubs around the country. • User forum: http://forums.csisoftwareusa.com • Wiki • It’s FREE!

  19. Question and Answer

  20. Account Managers ToniGrafner tgrafner@csisoftwareusa.com 800-247-3431 x223 Randy Cruz rcruz@csisoftwareusa.com 800-247-3431 x278 Western North America Eastern North America

  21. Coming Up Next… • 4:00 – 5:00p: Town Hall Meetings! • Health, Fitness, and Wellness Centers, Forest I • Non-Profits (JCC/YMCA), Forest II • Campus/Parks & Recreation, Forest III • 6:00p • Bus leaves for Rainbow Lodge!

More Related