NORTH-WESTERN TERRITORIAL DEPARTMENT OF ROSGRANITSA 2012

NORTH-WESTERN TERRITORIAL DEPARTMENT OF ROSGRANITSA 2012 . NORTH-WESTERN TERRITORIAL DEPARTMENT OF ROSGRANITSA. R O S G R A N I T S A. Responsible for - developing and realizing the state policy , - legal regulation , - managing the state property ,

nicole
Download Presentation

NORTH-WESTERN TERRITORIAL DEPARTMENT OF ROSGRANITSA 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NORTH-WESTERN TERRITORIAL DEPARTMENT OF ROSGRANITSA 2012

  2. NORTH-WESTERN TERRITORIAL DEPARTMENT OF ROSGRANITSA R O S G R A N I T S A • Responsible for • - developing and realizing the state policy, • - legal regulation, • - managing the state property, • rendering of the state services in the area of the • arrangement of the border-crossing points, • establishment, creation, development, and maintain • of the border-crossing points at the state border of • the Russian Federation the Decree of the President of the Russian Federation № 1359 issued on October, 11, 2007

  3. NORTH-WESTERN TERRITORIAL DEPARTMENT OF ROSGRANITSA Railway border-crossing points Russian-Finnish state border Federal Target Programme RCBPSaint-Petersburg - Finlyandskii 2012 Reconstruction and technical equipment

  4. NORTH-WESTERN TERRITORIAL DEPARTMENT OF ROSGRANITSA Railway border-crossing points Russian-Finnish state border Federal Target Programme RCBP Vyborg 2012-2013 Design and Construction

  5. NORTH-WESTERN TERRITORIAL DEPARTMENT OF ROSGRANITSA Railway border-crossing points Russian-Finnish state border Federal Target Programme RCBP Buslovskaya 2012-2014 Design and Construction

  6. NORTH-WESTERN TERRITORIAL DEPARTMENT OF ROSGRANITSA Cross-border cooperation programme ENPI South – East Finland – Russia Svetogorsk – Imatra RBC’s Development

  7. NORTH-WESTERN TERRITORIAL DEPARTMENT OF ROSGRANITSA Bilateral cargo railway border-crossing point Svetogorsk Capacity • Project capacity - 9 pair of trains • Actual capacity - 3 - 4 pair of trains Nature of cargo • Forest • Chipped wood

  8. NORTH-WESTERN TERRITORIAL DEPARTMENT OF ROSGRANITSA Cross-border cooperation programme ENPI South – East Finland – Russia • Small scale project 824 000 € • “Svetogorsk – Imatra RBC’s Development” • Partners • - Finnish Transport Agency • North-Western Territorial Department of Rosgranitsa • Federal Institution for Construction and Maintenance of Facilities of Rosgranitsa (Rosgranstroy) • October Railway • Municipality of Imatra city • Project starts 01.02.02012, duration 24 months

  9. NORTH-WESTERN TERRITORIAL DEPARTMENT OF ROSGRANITSA Cross-border cooperation programme ENPI South – East Finland – Russia • Overall objective of the project • – to strengthen local and regional sustainable economic development in the programme area • - to speed the process of upgrading the status of Svetogorsk – Imatra border crossing point and its essensial infrastructure studies • Specific objective for RBCP Svetogorsk • - to equip with prior technical equipment

  10. NORTH-WESTERN TERRITORIAL DEPARTMENT OF ROSGRANITSA Expected results Construction of secure system

  11. NORTH-WESTERN TERRITORIAL DEPARTMENT OF ROSGRANITSA Expected results Construction of secure system

  12. NORTH-WESTERN TERRITORIAL DEPARTMENT OF ROSGRANITSA Preconditions for the border-crossing point reconstruction Financial feasibility study of the project The actual border-crossing capacity is more than the project capacity Participation of the organizations interested in the project The infrastructure of the adjoining border-crossing point

  13. NORTH-WESTERN TERRITORIAL DEPARTMENT OF ROSGRANITSA RBCP Svetogorsk development preconditions for the border-crossing point reconstruction Border-crossing point infrastructure (weighting equipment,etc., technical equipment) RBCP Svetogorsk becomes multilateral

  14. NORTH-WESTERN TERRITORIAL DEPARTMENT OF ROSGRANITSA THANK YOU FOR YOUR ATTENTION!