Ground Magnetometer

Ground Magnetometer. David Pierce UCLA. CDR Topic Overview. GMAG Subsystem Requirements & Specifications Block Diagram Electrical Diagram / Layout Mechanical / Mass / Power GPS Timing Software Instrument Integration and Test Schedule Issues. Requirements & Specifications.

nile
Download Presentation

Ground Magnetometer

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ground Magnetometer David Pierce UCLA

  2. CDR Topic Overview • GMAG Subsystem • Requirements & Specifications • Block Diagram • Electrical Diagram / Layout • Mechanical / Mass / Power • GPS Timing • Software • Instrument Integration and Test • Schedule • Issues

  3. Requirements & Specifications

  4. Requirements & Specifications • System Features • GPS Receiver Antenna and Electronics Integrated into one package May be located >30M from host (RS422 signals)  NTP compatible (1msec time accuracy) • Flxugate Magnetometer •  ±72KnT dynamic range @ 0.01nT Resolution (~23 bits) Offset DAC system for 256 possible ranges per axis  2 Vectors per second data rate Low Power < 4W Small Size 22cm x 13cm x 5cm Ruggedized All Weather Sensor Design USB interface for data retrieval and firmware upload

  5. XC2S50 FPGA PIC18F452 Micro-Controller GPS Serial Interface Block Diagram • UCLA GBO MAGNETOMETER SYSTEM OVERVIEW TCXO Sensor Heater USB USB Interface FPGA FLASH DB9F Drive PPS Timing Interface Axis 1 DB25F Axis 2 DB15F Axis 3 GPS Heater & Power Interface DIN-5F Power Regulation +/-15V +5V

  6. Electrical Interfaces • GMAG Interfaces • GPS ACUTIME2000 Antenna DB-15F • GPS Serial NTP Interface DB-9F • USB Data Interface USB-B • Sensor Fluxgate Magnetometer DB-25F • Power DC Voltage Input DIN-5F

  7. Electrical Interfaces GPS ACUTIME 2000 / NTP Interface Detail USB (Type B) Data & Time Packets Micro Controller Precise Time Sync COM2 (DB-9F) RXD RS-232 / TTL Interface GPS Configuration RTS GPS Time & Status GPS Connector (DB-15F) Event RS-422 / TTL Interface PORTA FPGA PPS PORTB PORTB

  8. Mechanical and Thermal • UCLA GBO Magnetometer Chassis 21.6cm USB Type B – GBO Data System DB9F – GBO Data System All components rated to operate at -40C - +85C DB15F – GPS Receiver DIN 5F – +12V Power Input 13.4cm DB25F – Fluxgate Sensor 5.1cm

  9. Mechanical and Thermal • GMAG PCB & Chassis

  10. Mechanical and Thermal • UCLA GBO Magnetometer Sensor DB25M 50Meters (Max) ~100cm 12.7cm

  11. Mechanical and Thermal • Ground Magnetometer Fluxgate Sensor

  12. Mechanical and Thermal • Ground Magnetometer Fluxgate Sensor Components

  13. Mechanical and Thermal • Installed Fluxgate Sensor at LANL

  14. Mass & Power • Sensor Mass: 15 Kg • Chassis Mass: 1.2 Kg • Input Voltage: (9 – 18)VDC • Input Current: GPS system 100ma. Magnetometer 250ma. Sensor Heater 600ma. (max) Electronics Heater 200ma. (max)

  15. Parts • All parts are industrial grade or better • All parts rated to operate at -40C - +85C

  16. GPS Timing • GMAG Data Timing • Sampling determined by TCXO (<10ppm aging) • Time Tagging determined by GPS (5msec) • GPS Time Quality Factor Logged • Time Recalculated Periodically Typ. Hourly • Re-Synchronization at Programmable Rate Optional

  17. GMAG Software • Program Components • GBO Site Installation Software Linux LabView 7.0 • Delivery 5/24/2004 • GBO Autonomous Software GNU C (POSIX) • Delivery 5/31/2004 • EPO Software Windows LabView 7.0

  18. GMAG Software

  19. GMAG Software

  20. GMAG Software

  21. GMAG Software • GMAG Data Products • Data Inputs Include: •  Configuration File (UCLA_GBO_SSSS_Vxx_xx.INI) uP Firmware File (UCLA_GBO_SSSS_Vxx_xx.UPF) FPGA Firmware File (UCLA_GBO_SSSS_Vxx_xx.GAF) • Data Outputs Include: •  Mag Vector Data (SSSSdddddd_MAG_hh_cc.RMD)  Mag Housekeeping Data (SSSSdddddd_MAG_hh_cc.HKD)  Magnetometer Log Data (SSSSdddddd_MAG_hh_cc.LOD)  Mag Calibration Data (UCLA_GBO_SSSS_Vxx_xx.CAL)

  22. Instrument Integration and Test Verification Tests Performed by UCLA • 2.6.1 GMAG Sensitivity (UCLA CF) • 2.6.2 GMAG 3-axis Sensing (SGDSD) • 2.6.3 GMAG Dynamic Range (UCLA CF) • 2.6.4 GMAG Time Resolution (UCLA CF) • 2.7.4 GPS Time Base (UCLA CF) • 2.7.9 Operating Temperature (UCLA CF) CF - Calibration Facility SGDSD - San Gabriel Dam Site Deployment

  23. GMAG Delivery Schedule GBO GMAG Deliveries GMAG #1 6/18/2004 GMAG #2 6/21/2004 GMAG #3 6/28/2004 GMAG #4 9/24/2004 GMAG #5 10/07/2004 GMAG #6 3/14/2005 GMAG #7 5/02/2005 GMAG #8 5/09/2005 GMAG #9 5/16/2005 GMAG #10 5/23/2005 GBO GPS Only Deliveries GPS #1 7/02/2004 GPS #2 12/06/2004 GPS #3 1/25/2005 GPS #4 3/16/2005 GPS #5 5/16/2005 GPS #6 6/09/2005 GPS #7 11/01/2005 GPS #8 11/15/2005 GPS #9 12/01/2005 GPS #10 TBD

  24. GMAG Delivery Schedule EPO GMAG Deliveries EPOMAG #1 7/12/2004 EPOMAG #2 8/12/2004 EPOMAG #3 8/28/2004 EPOMAG #4 9/12/2004 EPOMAG #5 10/14/2004 • EPOMAG #6 6/15/2005 • EPOMAG #7 6/30/2005 • EPOMAG #8 7/15/2005 • EPOMAG #9 8/01/2005 • EPOMAG #10 8/15/2005

  25. Issues • GPS Operation at extreme low temperatures • LINUX application software in development