ISO New England Operations Significant Events December 2003 January 2004

ISO New England Operations Significant Events December 2003 January 2004. NEPOOL Reliability Committee February 3, 2004. Significant Events. 12/5 Declaration of OP4 Conditions 1/14 Declaration of OP4 Conditions 12/6 Loss of Salem Harbor Station.

niran
Download Presentation

ISO New England Operations Significant Events December 2003 January 2004

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ISO New England OperationsSignificant EventsDecember 2003January 2004 NEPOOL Reliability Committee February 3, 2004

  2. Significant Events • 12/5 Declaration of OP4 Conditions • 1/14 Declaration of OP4 Conditions • 12/6 Loss of Salem Harbor Station

  3. Declaration of OP4 ConditionsDecember 5, 2003

  4. Dec. 5 OP4 Conditions Initial Conditions (from morning report)

  5. Dec. 5 OP4 Conditions Events Contributing to OP4 • 16:13 – Millenium tripped due to low boiler level. • 16:42 – Lake Road #1 tripped. • 16:53 – Mystic 7 tripped due to an ID fan problem. • System load 500MW over forecast.

  6. Dec. 5 OP4 Conditions OP4 Trigger Maintenance crews at Yarmouth station were draining down the air system on breaker KG4/386 due to a compressor problem. At 17:25 low air pressure triggered a breaker failure lockout, transfer tripping the 391/386 and K386-4 breakers at Buxton, the KT1L breaker at South Gorham and the Yarmouth 4 generator.

  7. Dec. 5 OP4 Conditions • Instantaneous Capacity deficiency about 500MW • 17:30 - M/S#2 declared • 17:30 - OP#4 actions 1&6 implemented. • Total available relief from actions 1&6: 575MW

  8. Dec. 5 OP4 Conditions Conditions improve • 19:52 – The 386 line returned to service • 20:00 – All actions of Op#4 are cancelled • 21:00 – MS#2 cancelled

  9. Dec. 5 OP4 Conditions Peak hour capacity analysis

  10. Declaration of OP4 ConditionsJanuary 14, 2004

  11. Jan. 14 OP4 Conditions Initial Conditions (from morning report)

  12. Jan. 14 OP4 Conditions Morning. events • Multiple units reduced or OOS due to gas restrictions or freezing problems. • Evening peak load forecast raised 500 MW. • ISO anticipating 30 minute reserve deficiencies over the evening peak cancels all economic outages & recalls 342 line (Canal, Pilgrim, Auburn St.)

  13. Jan. 14 OP4 Conditions Afternoon events • 12:00 - M/S#2 declared for all Satellites • 13:30 - New Brunswick, TransEnergie all forecast 30 minute reserve deficiencies over the evening peak. • Restoration of 342 line delayed to difficulties reconnecting line leads. (550 Mw restriction on Canal generation)

  14. Jan. 14 OP4 Conditions Evening events • 17:00 – OP#4 actions 1&6 implemented. • 17:34 – Generator posturing initiated to maintain total 10 minute reserves. • 18:17 – 342 line restored. • 18:33 – Posturing cancelled.

  15. Jan. 14 OP4 Conditions Evening events • 19:00 – All actions of OP#4 are cancelled. • M/S#2 maintained until January 17th, 11:00.

  16. Jan. 14 OP4 Conditions Peak hour capacity analysis

  17. Loss of Salem Harbor StationDecember 6, 2003

  18. Dec. 5 L/O Salem Harbor

  19. Dec. 6 L/O Salem Harbor 20:27 • Fault occurs on the 22-46 circuit breaker at Salem Harbor. • T146 line & S145 terminal at Salem Harbor lock out. • Close in fault caused #1&2 transformer & #1 bus • differential relays to lock out all associated circuit breakers • Salem Harbor 1&2 trip.

  20. Dec. 6 L/O Salem Harbor • 20:37 - Salem Harbor 3 tripped, 33-54 & 33T CBs open. B154 now open ended and C155 radial to #2 bus. • 20:44 - #2 bus de-energized. • 21:37 - 22-46 CB isolated, T146 line shot & closed in. • 21:41 - #2 bus energized & some SS load picked up. • 21:53 – S145, B154, C155 closed in. Salem units receive permission to restart.

  21. Dec. 6 L/O Salem Harbor Summary • 75 MW of area load lost. • 313 MW of generation lost at Salem Harbor • 23:44 - all area load restored • No stability or thermal overloads occurred.