1 / 3

CSC Synchronization documentation

CSC Synchronization documentation. https://twiki.cern.ch/twiki/bin/view/CMS/CSCsynchronizationDocuments. Step-by-step procedure to… Read out a chamber Synchronize triggers from many chambers (and read out data) Description of each step, including… Requirements (LV, HV, etc.)

nirav
Download Presentation

CSC Synchronization documentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CSC Synchronization documentation https://twiki.cern.ch/twiki/bin/view/CMS/CSCsynchronizationDocuments • Step-by-step procedure to… • Read out a chamber • Synchronize triggers from many chambers (and read out data) • Description of each step, including… • Requirements (LV, HV, etc.) • Depends on (cable lengths, firmware, etc.) • Description of scan (including parameter name) • How to navigate Yellow Page to measure on one chamber, crate, or endcap • Example logfile of successful scan • Other stuff… • Description of TOF parameters • Description of parameters which affect timing (some indirectly) • Parameters which seem like they should be touched, but they shouldn’t • How to run scripts to… • Change a few parameters in one chamber • Change one parameter in many chambers • Insert measured scan values back into xml file • How to accommodate a change in L1A latency G. Rakness (UCLA)

  2. Finished, except for… • Description of… • ALCT and CLCT TOF parameters and measurables • CSCTF timing/MPC-SP automatic timing at Resync • Reference for fiber lengths (TTCrx delays) G. Rakness (UCLA)

  3. To do • Pick up neutron note • Read it again… what all is left to be done? • Likely need to pick up Chad’s analysis • FNAL • Write seminar • Write 20 minute short talk on “technical contribution” (need details) • Continue to study upgrade TDR’s • Upgrade meetings match to CD tasks • Management cleanup • RC job description • boxes for point 5 tasks • General • Template for Shift leader summary elog • Understand data losses G. Rakness (UCLA)

More Related