1 / 22

Eric Wing, GISP July 6, 2010 Penn State Advisor: Dr. Todd Bacastow

Leveraging Linear Referencing to Map Sewer Events from CCTV Logs. Eric Wing, GISP July 6, 2010 Penn State Advisor: Dr. Todd Bacastow. Overview. Background Objectives Methodology Timeline Challenges Anticipated Results Questions. Boise and Sewer. 650 miles of sewer lines

nitara
Download Presentation

Eric Wing, GISP July 6, 2010 Penn State Advisor: Dr. Todd Bacastow

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Leveraging Linear Referencing to Map Sewer Events from CCTV Logs Eric Wing, GISP July 6, 2010 Penn State Advisor: Dr. Todd Bacastow

  2. Overview • Background • Objectives • Methodology • Timeline • Challenges • Anticipated Results • Questions

  3. Boise and Sewer • 650 miles of sewer lines • 51,760 customers • 30 million dollars annual revenue • 150 users in Public Works Background Objectives Methodology Timeline Challenges Anticipated Results

  4. Sewer in the Field • GIS Data • Manholes • Mainlines • Service Laterals Background Objectives Methodology Timeline Challenges Anticipated Results

  5. GPS vs CCTV • GPS • Since 1995 • 22,431 records • Better representation • CCTV • Pre 1995 • 60,454 records Background Objectives Methodology Timeline Challenges Anticipated Results

  6. CCTV • Service Laterals • Roots • Material Changes • Cracks • Grease Background Objectives Methodology Timeline Challenges Anticipated Results

  7. Current Process Background Objectives Methodology Timeline Challenges Anticipated Results

  8. Issues • 12 year old UNIX server • ARC/INFO 7 AML and coverages • Many manual steps • Automated processes take 62 hours • Current solution has known limitations Background Objectives Methodology Timeline Challenges Anticipated Results

  9. Objectives • Streamline the process • Reduce manual steps • Automate where possible • Use ESRI ArcGIS 9.3 technology • No new extensions • No additional software • Correct for current limitations • Evaluate expansion opportunities Background Objectives Methodology Timeline Challenges Anticipated Results

  10. Project Management • Sponsorship • Coordination • Accountability • Guide the paradigm shift Background Objectives Methodology Timeline Challenges Anticipated Results

  11. Linear Referencing Background Objectives Methodology Timeline Challenges Anticipated Results

  12. Research Approach • Understand the problem before solving • Document current workflow • Literature review • Peer discussions with neighboring sewer agencies • Study linear referencing in ESRI software • Document business requirements Background Objectives Methodology Timeline Challenges Anticipated Results

  13. Development Approach • Iterative Design Background Objectives Methodology Timeline Challenges Anticipated Results

  14. Timeline • April • Project planning • Literature review • Requirements planning • May • Requirements gathering • Document current processes • June • Prototype • Finalize requirements • Present to peers • July • Conceptual design • Draft new process • Start development • August • Continue development • Document new processes • September • Implement solution • Closeout project • Present at conference Background Objectives Methodology Timeline Challenges Anticipated Results

  15. Challenges • Hansen 8 upgrade • Synchronization between GIS and Hansen • Appropriate level of solution sophistication • Models • Python scripts • Out of the box functionality Background Objectives Methodology Timeline Challenges Anticipated Results

  16. Challenges Continued • Reverse Setups • 12:00 and 6:00 observations Background Objectives Methodology Timeline Challenges Anticipated Results

  17. Anticipated Results • Significant time savings • Fewer manual steps • More automation • Eliminate UNIX server and ARC/INFO 7 • Open the opportunity to significantly expand capabilities Background Objectives Methodology Timeline Challenges Anticipated Results

  18. Prototype Results Background Objectives Methodology Timeline Challenges Anticipated Results

  19. Anticipated Results: Bonus • More data, better decisions • Wastewater pretreatment • Rehabilitation/reconstruction • Construction • Alternative to Hansen Background Objectives Methodology Timeline Challenges Anticipated Results

  20. Acknowledgements • City of Boise • Barbara Edney, GIS Analyst • Jim Pardy, Assistant City Engineer • Melissa Rushton, Public Works Project Coordinator / Hansen Specialist • Penn State • Dr. Todd Bacastow, Advisor

  21. References • Cadkin, J., & Brennan, P. (2002). Dynamic Segmentation in ArcGIS. ArcUser, July-Sept. Retrieved from http://www.srnr.arizona.edu/rnr/rnr420/dynseg.pdf • Clancy, D., Gustafson, J., & Higgins, L. (2002). Economical Sewer Main Rehabilitation Utilizing ArcGIS and Dynamic Segmentation. Retrieved from http://proceedings.esri.com/library/userconf/proc02/pap1181/p1181.htm • Curtin, K., Nicoara, G. & Arifin, R.R, (2007). A Comprehensive Process for Linear Referencing. Journal of the Urban and Regional Information Systems Association, 19 (2): 41-50. Retrieved from http://www.urisa.org/curtin • ESRI. (2001). Linear Referencing and Dynamic Segmentation in ArcGIS 8.1. Retrieved from http://www.esri.com/library/whitepapers/pdfs/lrds_arcgis.pdf • ESRI. (2003) Linear Referencing in ArcGIS: Practical Considerations for the Development of an Enterprisewide GIS. Retrieved from http://downloads2.esri.com/support/whitepapers/ao_/Linear_Referencing_in_ArcGIS.pdf • ESRI. (2006) GIS for Utilities [PowerPoint slides]. Retrieved from http://www.iowagic.org/resources/user-groups/eastern-iowa-user-group/past-events/january-25-2006/arcgis-tools-for-water-and-wastewater.pdf • Ferreira, A., & Duarte, A. (2005) A GIS-Based Integrated Infrastructure Management System. Retrieved from http://www.fig.net/pub/cairo/papers/ts_37/ts37_09_ferreira_duarte.pdf • Goodman, J.E. (2001). Maps in the Fast Lane – Linear Referencing and Dynamic Segmentation. Retrieved from http://www.directionsmag.com/article.php?article_id=126 • Meehl, J. (2004). Pipeline Integrity Management Using Linear Referencing With ArcObjects. Retrieved from http://proceedings.esri.com/library/userconf/proc04/docs/pap1976.pdf • Pierre, J., Mosher, J., Hargis, A. (2006). Linear Referencing in Boulder County, CO: Getting Started [PowerPoint slides]. Retrieved from http://proceedings.esri.com/library/userconf/proc06/papers/papers/pap_2071.pdf

  22. Questions