1 / 1

GKP HQ

Connectivity Of Proposed COIS Phase -II with Existing FOIS Network (N.E. Rly.). STM Coaching. CTNL. Cardex Section. GKP SM. CTNC. Spare. CTNC. To CRIS. CTNC. Kathgodam. GKP HQ. Chappra. RUPC. Lalkuan. Deoria Sadar. AOM Coaching. Gonda. CTNL. CTNC. Izzat Nagar. RMS.

nituna
Download Presentation

GKP HQ

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Connectivity Of Proposed COIS Phase -IIwith Existing FOIS Network (N.E. Rly.) STM Coaching CTNL Cardex Section GKP SM CTNC Spare CTNC To CRIS CTNC Kathgodam GKP HQ Chappra RUPC Lalkuan Deoria Sadar AOM Coaching Gonda CTNL CTNC Izzat Nagar RMS AOM Coaching To CRIS To CRIS Varanasi RMS AOM Coaching CTNC (LJN Stn) CTNC Manduadih Lucknow CTNL RMS Legend Rly 64 Kbps Ch. Existing BSNL 64 Kbps Ch. Existing Proposed COIS location Phase-I COIS locationsproposed by STM/Coaching and Sanctioned by CRIS 17 Existing FOIS Router 64 Kbps Existing FOIS Router 64 Kbps required to be upgraded by 2 Mbps New proposed COIS Router 64 Kbps Proposed 2 Mbps from Railtel Existing ISDN Note :- FOIS Terminals are not shown SNM/FOIS STM/Coaching

More Related