$4,ooo,ooo State Bonding Request for the Construction of Trunk Water Main Pipeline February 2014

$4,ooo,ooo State Bonding Request for the Construction of Trunk Water Main Pipeline February 2014. City of Lake Elmo Request. $4 million dollars of state bonding funds to provide clean, potable water to homeowners in the I-94 corridor – 42% of project costs;

nitza
Download Presentation

$4,ooo,ooo State Bonding Request for the Construction of Trunk Water Main Pipeline February 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. $4,ooo,ooo State Bonding Request for the Construction of Trunk Water Main Pipeline February 2014

  2. City of Lake Elmo Request • $4 million dollars of state bonding funds to provide clean, potable water to homeowners in the I-94 corridor – 42% of project costs; The City of Lake Elmo will bond for $5.5 million The project provides the correct pressure and clean hydraulics to serve taxpayers that are currently on PFC adulterated wells and new growth mandated by the Met Council

  3. Regulatory Squeeze

  4. Lake Elmo Mandated Growth

  5. Lake Elmo PFC Water Adulteration • 30% of the Lake Elmo Water Aquifer is adulterated with PFCs and metabolites • Well #3 hovers at the health standard for acceptable PFC levels and has tested above in the last 18 months • Drilling a well on the I-94 Corridor may pull contaminated water across the ground water divide. • PFCs are persistent and bio-accumulative • MDH has reported PFCS MAY cause significant health risks and suggested the transmission of untreated water from the northeast is prudent

  6. PFCs

  7. Interconnect to St. Croix Re-appropriation of Total Interconnect to Mississippi

  8. Thank You for Your Consideration