1 / 1

Making collections in GLM during Mn 2011 beamtime

Making collections in GLM during Mn 2011 beamtime. As Mossbauer and emission channelling are running in parallel, some things need to be changed before making collections. For Parallel running (central mass = 61Mn) GLM.DP10 = 1107 GLM.KI08 = -151.62 GHM.DP10 = 1852.

nizana
Download Presentation

Making collections in GLM during Mn 2011 beamtime

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Making collections in GLM during Mn 2011 beamtime As Mossbauer and emission channelling are running in parallel, some things need to be changed before making collections. For Parallel running (central mass = 61Mn) GLM.DP10 = 1107 GLM.KI08 = -151.62 GHM.DP10 = 1852 For normal collections into GLM: GHM.DP10  1252 GLM.DP10  265 Then, load QP array for normal GLM: GLM-Mn-beamtime-55Mn-50kV-DP10=265-310811.csv (load file in “EQARRAY” directory: year2011/ssp/) If no window, then look in “active tasks” (load file, then write buffer to eq…) Then change mass as usual, make collections… After: reset DP positions. Load Mossbauer QP array, (from 010911)…and write to buffer…. Then!!! Change the GLM.KI08  -151.62

More Related