MSW BASED POWER PLANT. AVANT - GARDE ENGINEERS AND CONSULTANTS (P) LTD. Growth. 28 Years of distinguished Engineering Services. Group. Consultancy and Detailed Engineering Services. Avant-Garde Engineers and Consultants (P) Ltd. Supply of Power Plant Equipment, Site Services, O&M,
E N D
MSW BASED POWER PLANT AVANT - GARDE ENGINEERS AND CONSULTANTS (P) LTD
Growth • 28 Years of distinguished Engineering Services
Group Consultancy and Detailed Engineering Services Avant-Garde Engineers and Consultants (P) Ltd Supply of Power Plant Equipment, Site Services, O&M, Plant Revamping Avant-Garde Systems and Controls (P) Ltd Infra Projects Avant-Garde Projects and Infra (P) Ltd Consultancy and Detailed Engineering Services for Overseas Projects Avant-Garde Engineers & Consultants FZC, Sharjah
Quality Assurance and Accreditation ISO 9001 : 2015 ISO 17020 : 2012 CDC
Staffing 200+ Workforce 40,320 Engg Man-hours / Month 7,000 Man-hours / Month - Job shopping
Domain Strength Sugar Plants Raw Sugar, Plantation White, Refined Sugar IPP, CPP, Biomass, Co-Gen, MSW, WHRSG, DG, GTG Distillery/Ethanol Plants Molasses, Grain Sweet Sorghum Solar Plants Power Plants PV, CSP Boiler Design Co-Generation Plants Grate Boiler, AFBC, WHRSG Bagasse, Coal, SLOP Fired
Waste to Energy Projects - Completed • Two (2) projects have been commissioned to a cumulative capacity of 30 MW • Shriram Energy Systems Limited – 6 MW in A.P • Delhi MSW Solutions Limited – 1200 TPD / 24 MW MSW based Power Plant • Detailed Project Report (DPR) has been completed for eleven (11) projects
Current Waste to Energy Projects • PallavapuramTambaram MSW Pvt. Limited – 300 TPD / 5 MW RDF based WtE Project in Chennai • Hyderabad Integrated MSW Limted – 1200 TPD / 24 MW WtE Project at Jawahar Nagar, Hyderabad • RewaWtE Project Limited – 340 TPD / 6 MW WtE Project in M.P • Pune Bio-Energy Systems Private Limited – 750 TPD / 12 MW WtE Project in Pune
WASTE TO ENERGY (DIRECT MASS INCINERATION) • Presented By: • J. Gladstone Evans • (HOD – Thermal Department) AVANT-GARDEENGINEERS AND CONSULTANTS (P) LTD
INTRODUCTION • WASTE TO ENERGY TECHNOLOGY AVANT-GARDE
WASTE TO ENERGY (WTE) • Waste To Energy (WTE) is Process / Technology to obtain useful energy from waste (MSW / RDF), in the form of Heat (or) Electricity (or) Fuel for further conversion. • There are various Process / Technology available in WTE • Biological Processing Technology (Composting, aerobic digestion, Bio-methanization, etc) • Thermal Conversion technology AVANT-GARDE
WTE - INCINERATION • Incineration Technology is a well developed technology followed in many countries from past few decades. In India also recently, few plant are in continuous operation with this technology. • Incineration is the Engineered process of controlled burning / combustion of solid waste at a high temperature, in the presence of oxygen. • Incineration of Municipal Solid Waste (MSW / RDF) is divided in to two broad categories • Burning “as received” waste. • Burning “pretreated” waste. • Burning of the “as received” waste requires little or no pretreatment (RDF – 1 & 2). This is termed as Direct Mass Incineration (DMI). Burning of pretreated waste (RDF – 3, 4 & 5), requires considerable amount of treatment process. AVANT-GARDE
WASTE TO ENERGY RISK’S TO BE ANALYSED IN TECHNOLOGY SELECTION AVANT-GARDE
INCINERATION - ADVANTAGES • It address two sets of environmental issues in one stroke – Land use and pollution issues & Environmental impacts of fossil power plants • Volume and weight reduction (approx. 85 to 90% in volume and 75% in weight) • Waste Reduction & Destruction is immediate, no long term wait is required • No foul smell and infections to the public • Incineration is carried out at generation site • Air discharges can be well controlled to the permissible norms • Ash residue is usually do not protrude, they are sterile & inert • Small disposal area required • Investment cost can be offset by heat recovery / sale of energy AVANT-GARDE
WASTE TO ENERGY • INCINERATION TECHNOLOGY AVANT-GARDE
INCINERATION - TECHNOLOGY SELECTION Moving Grate Fluidized Boiler Rotary kiln • Pretreatment of MSW is not required • High capacity and thermal efficiency • Drying and carbonization takes place in the first zone, followed by ignition and combustion in the second and complete burn-out and cooling of the slag in the third. • RDF, Sludge, co-firing , etc • Requires extensive pre-treatment of MSW • Waste is introduced into a sand bed which is fluidized via blowing air through a nozzle floor • Very sensitive towards the RDF size and its density • For Hazardous and hospital waste. • Cannot be used for burning MSW. • Burning at a very high temperature with a long residence time and requires support fuel. AVANT-GARDE
MOVING (STEP) GRATE - WTE BOILER Heat Recovery System 2 Ash & Leachate Disposal System 4 MSW Receipt, Storage, Pre-processing & Feeding System Incineration System Flue gas cleaning & Safe disposal System 1 2 3 AVANT-GARDE
MSW HANDLING – SOURCE TO BOILER • Proximity to the waste generation • Traffic & Transport • Approach Road to the Plant MSW Receipt, Storage, Pre-processing & Feeding System Weigh Bridge MSW Receiving Platform MSW Pit Grab Crane with its control system Fuel feed hopper AVANT-GARDE
PRE-PROCESSING IN MSW PIT • Function of MSW pit • To reduce Surface Moisture • To Homogenize the incoming MSW • To remove the large debris/ inerts • To create a buffer & to reduce fluctuations • With above features, the output from the pit will qualify under RDF 1 of ASTM classification AVANT-GARDE
IMPROVEMENT IN CALORIFIC VALUE OF MSW IN PIT Boiler Efficiency (% LCV basis) Leachate collection quantity, Greatly depends on -The numbers of storage days, Storage height, Surface moisture in the MSW, Compaction in the pit, etc. AVANT-GARDE
WASTE TO ENERGY PLANT • The various important systems in the WTE plant is listed below: • MSW handling, Pre-processing (If required) and feeding system. • Incineration System (MSW Firing & combustion system) • Heat Recovery System from the flue gas & Power Generation System. • Gas cleaning & Disposal system • Ash Collection, Handling, Storage & Disposal system AVANT-GARDE
6 5 1 2 3 FIRING AND COMBUSTION SYSTEM • It is the most critical part in the WTE Boiler. Major components of the combustion system is • 1. Ram feeder • 2. Pusher Grate • 3. Hot air to grate • 4. Furnace / Combustor • 5. Over fir air system • 6. SCAP 4 AVANT-GARDE
FIRING & COMBUSTION SYSTEM • Furnace and firing Grate Construction & its Arrangement • Refractory in the combustion chamber and its material selection. • Operating Excess Air levels in various zones in the grate & furnace • OFA system arrangement and its effectiveness. AVANT-GARDE
WASTE TO ENERGY PLANT • The various important systems in the WTE plant is listed below: • MSW handling, Pre-processing (If required) and feeding system. • Incineration System (MSW Firing & combustion system) • Heat Recovery System from the flue gas & Power Generation System. • Gas cleaning & Disposal system • Ash Collection, Handling, Storage & Disposal system AVANT-GARDE
ENERGY RECOVERY SYSTEM Steam Generator • Process – 1: Water to steam in Steam generator ( 2 – 3) • Process – 2: Steam is expanded in steam turbine (3 - 4) • Process – 3: Steam is condensed in a condenser (4 – 1) • Process – 4: Condensate is circulated / Pumped back to the boiler (1 – 2) 2 3 Turbo Generator 1 4 Boiler Feed Water Pump Condenser AVANT-GARDE
SELECTION BASIS FOR POWER CYCLE PARAMETER • Capacity of Power Plant • Type of Power Plant • Characteristics of Fuels and ash • Operation with the existing Facility • Initial Investment • Limitation in the technology AVANT-GARDE
HISTROY OF STEAM CYCLE PRESSURE • There is a gradual increase in the power cycle parameters across the globe • Today there are many small capacity power plants operating at 87ata and 110ata. • However, WTE power plants normally operate a power cycle levels of 45ata & 400°C. The data furnished above is preliminary in nature. Contact AVANT-GARDE for precise / more detail AVANT-GARDE
STEAM AND POWER OUTPUT FROM 1.0TPH OF MSW AT PIT(At a steam pressure of 45ATA & 400°C, with a feed water temperature of 130°C) The data furnished above is preliminary in nature. Contact AVANT-GARDE for precise / more detail AVANT-GARDE
TYPICAL HEAT AND MASS BALANCE OF A 750TPD WTE PLANT The data furnished above is preliminary in nature. Contact AVANT-GARDE for precise / more detail AVANT-GARDE
WASTE TO ENERGY PLANT • The various important systems in the WTE plant is listed below: • MSW handling, Pre-processing (If required) and feeding system. • Firing and combustion system. • Energy recovery system from the flue gas. • Gas cleaning & Disposal system • Ash Collection, Handling, Storage & Disposal system AVANT-GARDE
EMISSION STANDARD - SWM 2000 & 2016 RULES AVANT-GARDE
FURNACE – RESI TIME & TEMPERATURE 1 SNCR / SCR SYSTEM 2 FGD SYSTEM 3 ACTIVATED CARBON INJECTION SYSTEM 4 DE DUSTING SYSTEM 5 GAS CLEANING & DISPOSAL SYSTEM GAS CLEANING SYSTEM EQUIPMENTS (As per SWM 2016) AVANT-GARDE
GAS CLEANING SYSTEM – SEMI DRY SYSTEM Chimney Height will be around 60mts AVANT-GARDE
WASTE TO ENERGY PLANT • The various important systems in the WTE plant is listed below: • MSW handling, Pre-processing (If required) and feeding system. • Firing and combustion system. • Energy recovery system from the flue gas. • Gas cleaning & Disposal system • Ash Collection, Handling, Storage & Disposal system AVANT-GARDE
ASH SYSTEM • Bottom Ash (Slag) – From combustion chamber / Grate outlet (Course Ash) • Fly Ash • Heat Recovery Ash – Collected in the heat recovery sections (Boiler, Superheater, Economizer, & Air heater ) – (Combination of course & Fine ash) • Dust collector Ash – Particulate matter removed from dust collection equipments (ESP / Bag Filter) – (Fine Ash) AVANT-GARDE
ASH COLLECTION POINTS IN THE WTE BOILER Fly Ash – From Dust Collector Ash Fly Ash - Heat Recovery Ash Grate Ash - Slag AVANT-GARDE
ASH REUSE OPTIONS • Construction fill • Road Construction • Pavement Blocks & Kerb stones • Landfill Daily Cover • Cement Block Production AVANT-GARDE
LEACHATE SYSTEM • Leachate drainage system. • Leachate storage and discharge system. • Leachate treatment system. • RO based treatment system. • Biological treatment followed by RO system. (Further Energy recovery from the Leachate to an extent of 10 to 15kW/m³/hr is possible) AVANT-GARDE
WTE PLANT • Land Requirement – 10 to 20Acres • Water consumption will be around 225 to 250kl/day in case of ACC & 1300 to 1400kl/day in case of WCC (Typical values for a 750TPD WTE Plant) • In house power consumption will be around 17 to 20% • Plant Availability - 60% for 1st Year, 70 – 75+% from 2nd Year Onwards • Load factor - 80 – 90% • Manpower - Approx 60 - 100 • Project Schedule - 20 to 24Months from Boiler & TG ordering. • Cost of the WTE plant will be around 12 to 15Cr / MW AVANT-GARDE
POWER GENERATION FROM WTE PLANT AVANT-GARDE
AVANT-GARDE’S EXPERIENCE IN MSW BASED WTE PROJECTS • Two MSW / RDF based WTE projects commissioned with a cumulative capacity of 30MW. • DPR has been completed for about 11.0 MSW based WTE projects • Four MSW / RDF based WTE projects are under execution with a cumulative capacity of around 70MW. AVANT-GARDE
INDIAN EXPERIENCE IN DMI • Hi-MSW2400TPD (4 x 600TPD) Plant @ Hyderabad with 48MW PP • Pune Bio Energy Limited 1 x 750 TPD Plant @ PUNE with 13MW PP • Ramky @ Rewa Plant – 1 x 300TPDplant with 6.0MW PP • Essel Infra, Chennai – 1 x 300TPD with 4.0MW PP • Jindal Power Project 1350TPD @ Okhla(3 x 450TPD with 21MW PP – Operating in the range of 17 to 21MW) • Delhi MSW 1200TPD Plant @ Delhi (2 x 600TPD with 24MW PP – Operating in a range of 15 to 22MW) • Essel Infra Pvt. Limited – 600TPD @ Jawalphur. (1 x 600TPD with 11.5MW PP – Operating in a range of 6 to 11MW) • IL&FS – 550TPD of RDF @ Gazipur . (1 x 550TPD with 12MW PP – Operating in a range of 2 to 3MW) AVANT-GARDE
SUMMARY (MSW - A new beginning for an old source) • DMI with Energy Recovery is one of the best WTE technology suitable for wide varying fuel like MSW, for effective disposal of waste. There are more than 1000 WTE plant with DMI technology in operation world wide. In India, around four (4) plants are is successful operation and few plant are under construction stage. • In the incineration technology, there is a volume reduction to an extent of 90% and the gasses are let out from the chimney, satisfying the pollution norms. Most of the ash from the WTE plant can used. • There is a power generation potential from the MSW in the order of 270 to 445kW / TPH of MSW depending on the LCV. • With Tipping Fees, Capital Subsidiary from the Government & Export power cost above 7.0Rs / unit, the DMI based WTE project becomes viable with a pay back less than 5.0years. AVANT-GARDE