An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FPDS-NGAgency DayJuly 21, 2003

  2. Recent Activities • Specifications • Product Development • Change Management

  3. Specifications • Specifications published for Agency review on www.FPDSNG.com • Web services specifications • XML specifications • Reviewed by IAE and GSA

  4. Product Development • Hardened the Reference Implementation from prototype to production quality code • Increased functionality of FPDS-NG • IDV • Reference data • System Administrator functions • Portal • Modifications • Corrections/Voids • Enhanced reporting • Batch processing • FPDS data migration

  5. Outreach efforts to Agencies and vendors underway Briefings scheduled with DOT DHS EPA Briefings held with Change Management • USCG • DOD • State • Commerce • IRS • AMS • CACI • Compusearch • VA • HUD • Interior

  6. Product Demonstration • System Administration • Data Collection • Reports

  7. Lunch Break

  8. Integrated Systems • USCG – Finance & Procurement Desktop (FPD) • USCG – PRISM • DOD – CACI • DOI – Procurement Desktop (PD) • HUD – HPS

  9. Early Adoption Integration Methodology • Meet with Agency and technical representatives • Visualize the existing and desired architecture • Review of feeder systems and data warehouses • Agreement on timeline and resource availability • Review by Agency technical staff of specifications • Determination of key integration points in source system(s) • Technical support as needed from GCE staff • Integration testing • This is an accelerated version of the FPDS-NG Agency Integration Plan

  10. Integration Methodology

  11. USCG – FP Desktop • Current/Proposed Integration Architecture • Technology • Integration Method • Duration • Demonstration • Q/A

  12. Current Architecture

  13. Integration • Technology • Web HTML/Java • Government owned system • Integration Method • GUI Object • Duration • 1 week

  14. Demonstration

  15. PRISM • Current/Proposed Integration Architecture • Technology • Integration Method • Duration • Demonstration • Q/A

  16. Integration • Technology • Web ASP (Microsoft) • COTS product • Integration Method • GUI Object • Duration • 3-4 days

  17. Demonstration

  18. CACI – DOD • Current/Proposed Integration Architecture • Technology • Integration Method • Duration • Demonstration • Q/A

  19. Integration • Technology • Progress • COTS product • Integration Method • GUI Object • Duration • 2 days

  20. Demonstration

  21. DOI – Procurement Desktop • Current/Proposed Integration Architecture • Technology • Integration Method • Duration • Demonstration • Q/A

  22. Integration • Technology • PowerBuilder 6.5 • COTS product • Integration Method • GUI Object • Duration • 2 days

  23. Demonstration

  24. HUD – HPS • Current/Proposed Integration Architecture • Technology • Integration Method • Duration • Demonstration • Q/A

  25. Integration • Technology • PowerBuilder 6.5 • Government owned system • Integration Method • GUI Object • Duration • 1 day

  26. Demonstration

  27. In Progress • IRS – GOTS • Commerce – CACI • DOD Ed. – CACI

  28. Next Steps • FAC Briefing – July 29, 2003 • FQT – July 30 – August 5, 2003 • System Administrator Training – August