1 / 49

Hotel Management System With Online Environment For Hotel Riviera

Hotel Management System With Online Environment For Hotel Riviera. FHA.SHIBLY SEU/IS/03/MG/031. Outline. Background of The Company Introduction to Hotel Management System Technology Used in the HMS System Analysis and My Approach to the System Design Implementation

Download Presentation

Hotel Management System With Online Environment For Hotel Riviera

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hotel Management System With Online Environment For Hotel Riviera FHA.SHIBLY SEU/IS/03/MG/031

  2. Outline • Background of The Company • Introduction to Hotel Management System • Technology Used in the HMS • System Analysis and My Approach to the System • Design • Implementation • Testing and Evaluation • Future of the OHMS

  3. Background of the hotel Riviera • The Riviera resort is a Tourist Resort. It is located in the charming fishing town of Batticaloa, in the eastern coastal district of Sri Lanka. This resort was established in 2000.

  4. This resort has 38 rooms with all the Facilities. • There are double single and family rooms with attached bathrooms. There are in door and out door games facilities with swimming pool. Air-conditioned rooms too are available.

  5. Introduction of current system • Guest registration • Room reservation • Food order • payment calculation

  6. Problems identified • It takes more time to reserve the room. So performance of the current system is slow. • Now the current system is running manually. So they are facing the following problems. • Difficult to handle data accurately and security because of the data lost, viewing by unauthorized people, can’t collect the data at the time.

  7. Day to day current system is very costly • So security wise is not guarantee to all information and data’s. • If customer wants search their details it very difficult • Processing delay • Not easy to handle room details • Storage problems • Unable to analyze past data • (Update, Search, Delete, Edit), these types of methods are not accessible and not carry with the manual method

  8. Introduction to Online Hotel Management System (OHMS) • To resolve the current problems the Hotel decided to do in Fashionable way so that they no their situation. So Hotel agreed to do in computerized method to resolve the reservations problems. The Hotel believes that advantages of doing in a computerized system.

  9. The system will help the Hotel Riviera to operate efficiently by eliminating all the time consuming procedures and provide a better service to their customers as well as for the employees in the company.

  10. Two Main Parts • Web Based Reservation System (Customer’s Perspective) • Hotel Reservation System (Administration Perspective)

  11. Features of the New System • Handling Customer Details • Reservations • Cancellations • Handling Rooms Details • Making Payments • Features like Update, Searching, Deleting, Editing Record etc... • Generating different kinds of report. • Customers can view videos of hotel rooms with audio explanations. • Customers Make reservations, enquiries and cancellations via online.

  12. Waterfall Development-based Methodology

  13. Method of Analysis • E-R Diagrams • Relations/Tables • Data Flow Diagram • Context Diagram (0 Level DFD) • Level 1 DFD • Level 1 DFD • Flow Charts

  14. Data Flow Diagram (DFD) • Data Flow diagrams are a network representation of a system. • Four entities that must be represented are: • Data flows: movement of data in the system • Data stores: data repositories for data that is not moving • Processes: transforms of incoming data flows to out going data flows • External entities: sources or destinations outside the specified system boundary

  15. Context Level for Proposed System

  16. First Level for Proposed System `

  17. Second Level for Proposed System

  18. Mapping ER Diagram for Reservation System

  19. Flow Charts

  20. Technology Used in the SOSM System • The technologies that should be taken into consideration when implementing the system are as follows:- • Re-usability • Efficiency and performance

  21. Tools to be used in developing the system • Graphic Editor Software • Adobe Photoshop will be used as a graphic editor. Since it is not complex to work and it has more sophisticated features. • Web Development Tool • Macromedia Dreamweaver version 8 will be used for web development tool.

  22. Development Language Requirements • Familiarity • Web Support • Rapid Development • Execution Speed and Efficiency

  23. Database Software SQL Server 2000 and MS Access were selected as the database software for this project out of the available software in the market.

  24. Operating System • Windows is selected as the operating system software since it works well or run well PHP and VB.

  25. Programming Language • PHP – Hypertext Pre-processor:-PHP is a server-side scripting language. Although it was originally designed to run under Linux using the Apache Web server. • VB (Visual Basic) language for Administrators perspective reservation system.

  26. Apache as the Web Server The Apache Web Server, maintain by the Apache Software foundation, is currently the most popular Web server because its stability, efficiency, portability, security and small size and mainly it is Open Source.

  27. Design • Software Architecture, • Input and Output Design, • Interface Design and • Security Design

  28. VB Designs

  29. Menu and screen Form designs.

  30. Create a login by administrator for administrator and user

  31. Banquet reservation form

  32. This form shows Room reservation

  33. Room and banquet confirmation form design

  34. Web based Design

  35. Web page designs • Main web page description

  36. Links

  37. Implementation Plan This plan describes how the developed system will be deployed. It contains an overview of the system, Implementation

  38. The system to be implemented is an Online Hotel Management for Hotel Reveira. • It is a web-base and a Visual Basic developed to run on a PHP/MySQL/Apache server and in Visual Basic. • This is developed to assist the company in providing a better reservation service to their manages,and to the Customers also.

  39. Major task required for the implementation of the system • Providing overall planning and co-ordination for the implementation. • Providing appropriate training for personnel • Ensuring that the user manual is available for the implementation effort • Ensuring that all prerequisites are met. • Performing data conversion before loading the data into the developed system.

  40. Description of the implementation • Firstly, the web server software (Apache) and database software (Mysql) are checked if they are present, if unavailable, they are installed. • PHP and VB software is deployed • The System developed is then implemented.

  41. Also instead of using above first three steps you can use the Xampp, which is consider a open source package that comes with the Apache server mysql database as a configured one. • Import a Database backup. • The system implemented is tested in the client PC’s.

  42. Implementation of Database • The database tables were successfully created using My SQL and MS Access. • All the tables mentioned were designed and implemented appropriately with the appropriate fields and their data types.

  43. Testing and Evaluation • Component Testing The program deals with database and some ActiveX controls and references some runtime libraries therefore it was essential to test if they are properly referenced or not. • installed Visual Basic 6.0 and Crystal Reports on the target test machine and run the system. All of them were successfully running without any problems

  44. Integration Testing • This test was mainly carried out to see the links between a forms and reports in the system. There are a number of different forms and reports linked together. So it was necessary to check the operability of the links found on the multiple document interface (MDI) form.

  45. This testing mainly focused to check whether links between the forms and reports in the system work correctly. There are two kinds of test within this testing process.

  46. Test links from the MDI form to other forms: when the user clicks on the menu, it will call respective form. • For example: when the user clicks on “Guest” menu, it will open Guest window.

  47. Future • Mobile Reservations • Virtual Reality • Adding ERP and BPR

More Related