140 likes | 308 Views
Before. The hardwood in the ceiling gave a warm feeling to the pool. Before. A water aerobics class while the roof was fully functional. Before. The roof was still fully functional during the Halloween Thing of ’03. Before. During slide installation Winter 2004.
E N D
Before The hardwood in the ceiling gave a warm feeling to the pool.
Before A water aerobics class while the roof was fully functional
Before The roof was still fully functional during the Halloween Thing of ’03.
Before During slide installation Winter 2004
Under construction The hard wood beams are being removed
Obstacles After one of the major snow storms this winter 2006.
Taking shape. • The foundation of the Aquatics Center starts to develop a new skeleton. June ’07
Making progress. • Setting the steel supports into place. June ’07
Progress continues. • Sunshine and steel – a great combination for this construction project. June ’07
A roof. • The progress continues and the beginnings of a roof emerge. July ’07
Growth. • Looking inside, at the wall where the diving boards used to be. A roof develops. July ’07
As the work continues… • Visit us again for more photos and information on the Aquatics Center’s amazing metamorphosis.