An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Rendezvous with Technical Branch Bryan Leamons, P.E. Engineer Supervisor ADEQ - Solid Waste Management Division

  2. Updates 2011 SWEPCO Turk Landfill Coal Combustion Residuals Drilling Wastes Operating Plans AEIR Forms – Cost Worksheets Overfills Liquid Bulking Plans Transfer Station General Permit

  3. Transfer Station General Permit General Permit – A single or common permit issued by the Department following public notice and comment for a class of solid waste processing facility owners and operators. Eligible owners and operators may construct and operate under the terms of the general permit without obtaining an individual permit. [APC&EC Reg. 22.102] New Type TS issued May 13, 2011 Notice of Intent (NOI) due July 29, 2011

  4. Old Permit - Problems Financial assurance adequacy Poorly developed operating plans Special handling/storage for industrial, special, or commercial wastes or recyclables Sorting and storage activities Stormwater permits Unpermitted discharges

  5. New Permit - Highlights No HHW collection/processing (unless exempt) Operating plans 3-day storage limit No dirty MRFs - Type WRF

  6. Closure Estimates - Financial Assurance Requirements A – $5,000 B – $10,000 C – $20,000 D – $30,000 Based on a 3-day storage limit and broad cost assumptions for loading, hauling, and disposal Amounts adjusted after stakeholder input

  7. Notice of Intent (NOI) More thorough Complete submittal of attachments required Professional Engineer required [22.301(i)] Industrial or special wastes Specifically referenced by the general permit

  8. Common Deficiencies Applicant or facility information incomplete Information inconsistent Location restrictions Site plan – boundary survey – drainage features Incomplete operating plan – wash-down No stormwater permit No financial assurance No PE review or certification

  9. Compliance Topics Capacities cannot be exceeded Water permitting affects facility design Modifications to design or operation Additional industrial or special materials Recordkeeping – Condition 23 Annual Reports – Condition 24

  10. Compost General Permit Draft permit not issued yet “Acceptable methods of composting” Stormwater - process water -leachate Financial assurance Stakeholder process planned for this spring

  11. Contact SW DivisionTechnical Branch Staffleamons@adeq.state.ar.us501-682-0587