1 / 17

CDF Status of Computing

CDF Status of Computing. Donatella Lucchesi INFN and University of Padova. Introduction. Status and Plans for data and Monte Carlo production @FNAL Status and Plan Monte Carlo production @CNAF/EU Data outside FNAL CDF-Italy needs Remote shift control room ( Fabrizio Scuri ).

nolcha
Download Presentation

CDF Status of Computing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CDF Status of Computing Donatella Lucchesi INFN and University of Padova Donatella Lucchesi

  2. Introduction • Status and Plans for data and Monte Carlo production @FNAL • Status and Plan Monte Carlo production @CNAF/EU • Data outside FNAL • CDF-Italy needs • Remote shift control room (Fabrizio Scuri) Donatella Lucchesi

  3. Data Production Status • Offline reconstruction algorithms frozen in fall 06 • Data reconstruction performed for 1 fb-1 • Post shutdown: • Dataset cut-off: Sep 01 ~ 200 pb-1 • Start producing new data Oct 01 • Done by end of November • Calibration process will be improved for the next step User level: • Many analysis use st-ntuples produced by the production Farm (not standard yet for B physics) • Diskpool in use for user (st-)ntuple, not production yet • (st-)ntuples stored also at CNAF Donatella Lucchesi

  4. CDF Resources Needsas IFC Proportional Model: scale FY2005 resources FY200x demand = (FY2005 resources)x(FY200x/FY2005)data vol. Input parameters: Results: Donatella Lucchesi

  5. Where CDF can find new Resources • Working on strategies to improve resources utilization: • One-pass production • Centralized ntuple production • Run dependent Monte Carlo production • Access GRID Resources • Merge several GlideCAF into one:NAmCAF • Born as Fermilab-San Diego CMS group project • Now include: FermiGrid, San Diego, MIT, Florida • lcgcaf: • CAF reimplementation to access LCG middleware • use gLite resource broker • CDF-Italy and INFNGrid project developed by: • F. Delli Paoli, D. Jeans, S. Sarkar, I. Sfiligoi and D.L. Donatella Lucchesi

  6. NamCAF It start being used Donatella Lucchesi

  7. Resources available to LcgCAF Italy: INFN-GRID: 2MspecInt2K, extra CNAF ~700KspecInt2K Already included: Barcelona, Lyon, Glasgow, Karlsruhe will be presented Joint Physics meeting and very soon in production! Donatella Lucchesi

  8. Need to be developed for CDF in GRID Monte Carlo Production Plans cdf-UI job job EU GRID LcgCAF output data GRID Storage Element cdf-cnaf-1 output data output data … validation storage area Buffer area Robotic Tape Storage SAM station Donatella Lucchesi

  9. LcgCAF Characteristic & Performances • CDF code distribution: AFS was a limitation, now • Parrot access to all sites • GRID failures due: sites misconfiguration, • temporary authentication problems and services • overloading in Resource Broker • Use GRID retry and the CDF internal resubmission mechanism Donatella Lucchesi

  10. Data analysis @CNAF • An automatic (almost) procedure to store at CNAF: • B data in any form: BCHARM dataset and/or • skimmed datasets and/or Bs-ntuple • st-ntuples (any format) for high-pt analysis • Provide users running on data at CNAF with standard CAF (icaf) area, access via CAF tools and rootd • Keep use GlideCAF until LcgCAF has same performances • Use LcgCAF to access data: • SAM-SRM interface development @FNAL. First deployment @CNAF: SRM installation (F. Delli Paoli) • Test of native GPFS (D. Jeans) • Lot of effort now in understanding which SRM Donatella Lucchesi

  11. CDF share respect to other experiments Total cpu time since April `05 Total cpu time August 2006 Need to agree with Tier 1 and Tier2 a minimum guarantee for CDF when LHC will start Donatella Lucchesi

  12. CDF needs: disk space CDF has some disk space assigned at CNAF. We ask for a little more to do data analysis Physics needs Currently: 75 TB Donatella Lucchesi

  13. CDF needs: cpu’s CDF is not asking more than what already discussed and approved. Tier 1 seems happy! Donatella Lucchesi

  14. Manpower Fermilab: I. Sfiligoi + San Diego group: “CAF +GRID transition” Replaced by D. Benjamin + R. Borgatti K. Genser T. Kuhr: “Data Handling and SAM” G. Compostella: Jul.-Sept. 2006, “CAF +NAmCAF” Italy: D. Lucchesi (coordination, SAM in Italy, data import-export) F. Delli Paoli (LcgCAF resp., CDF code, SRM development) ends in September 06 D. Jeans(GlideCaf-disk-user interface) new job Oct. 06 S. Sarkar(GlideCAF, LcgCAF, SRM) July 06 L. Brigliadori(support CNAF management) end January 07 New Assegno di ricerca @CNAF (Bando 10 settembre) F. Scuri +D. Fabiani Remote CO shift (Pisa) Interest express by colleagues for MC production coord. Donatella Lucchesi

  15. BACKUP Donatella Lucchesi

  16. Lcgcaf design Developers: F. Delli Paoli, D. Jeans, S. Sarkar and I. Sfiligoi advices Donatella Lucchesi

  17. Need for Physics Center Disk space: - BCHARM dataset and skimmed data are on disk - size of these datasets is scaled using luminosity, logging rate and event size What we need for B Data Donatella Lucchesi

More Related