CDF D&D Status

CDF D&D Status. J. Lewis 1/23/12. Progress. First floor counting room Racks nearly all removed Next step is underfloor cables May defer Major equipment Motor generators, COT gas filter system, test magnet gone Old chillers refrigerant removed High bay West side cabinets gone

Download Presentation

CDF D&D Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CDF D&D Status J. Lewis 1/23/12

  2. Progress • First floor counting room • Racks nearly all removed • Next step is underfloor cables • May defer • Major equipment • Motor generators, COT gas filter system, test magnet gone • Old chillers refrigerant removed • High bay • West side cabinets gone • Mezzanine ready for demoltion • East side clean-up done late February • Control room display computers installed

  3. Headaches • ODH • Can’t declassify until tunnel is • Waiting to disconnect equipment • Manpower • Techs removed to other projects • May get worse with shutdown • Progress has slowed • Planning • How to proceed in light of ORKA opportunity? • Plan for temporary tour program? What scope?

  4. Tour Program vs. ORKA vs. IARC

  5. Uses

  6. CDF → ORKA • Roll out central detector • Strip electronics • Remove tracker • Refurbish solenoid • Dismantle central calorimeter • Send to BNL for PHENIX upgrade? • Dismantle Cable Bridge • Dismantle muon walls • East and west torroids, north and south walls • Wild guess $1-2M M&S • Messy, stinky job

  7. Timeline: CDF → ORKA/IARC • Goal? • Early occupancy of high-bay and pit by IARC • Option: • Rehab detector early • Return to hall • Install ORKA detector package in situ • Engineering needed early • Support detector weight off Tevatron beamline • Are there pilings to bedrock or not? • In situ Installation

  8. CDF → Tourist Trap • Move west plug to new support structure • Static support for north wall • Move display items to passage area • Remove cable bridge with detector in place • Plan on shelf • Makes detector removal difficult • Life safety work • $115k • At least 90% necessary even for temporary tour program • Excludes stairwell work that J. Priest says should be done for any reuse of building