An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. May 21, 2007 Géraldine Conti Monday Seminar IT Frame Survey & Detector Boxes Fiducialisation 1

  2. IT Frames IT3A IT2A IT1A IT3C IT2C IT1C ~6m ~3.7m May 21, 2007 Géraldine Conti Monday Seminar IT Frame Survey Coordinate System (1) • The origin of the Survey coordinate system is at the Interaction Point (IP) • Correction of the nominal z values : z’ = znominal - tan(0.003601)·x • 6 half-frames to be surveyed ITA/C Survey coordinate system Z (SU) vertical Towards pit 1 (ATLAS) LHC Nominal Beam Line X (SU) horizontal 3.601 mrad IP horizontal LHCb coordinate system Towards pit 7 y Y (SU) horizontal z Towards LHC centre x 2

  3. May 21, 2007 Géraldine Conti Monday Seminar IT Frame preliminary results (2) • First IT « Geometrical Controls » (Local coordinate system) and Adjustments (Survey coordinate system) realized from the magnet area by a triangulation method (theodolite): • IT1C(Oct.18th 06, https://edms.cern.ch/document/790118 Geometrical Control ) • IT2C (Nov. 9th 06, https://edms.cern.ch/document/794872 Geometrical Control ) • IT3A (Jan.26th 07, https://edms.cern.ch/document/816280 Before Adjustment ) (Feb. 1st 07, https://edms.cern.ch/document/817512 After Adjustment ) • IT3C (Dec. 5th 06, https://edms.cern.ch/document/806184 Geometrical Control ) (Feb. 2nd 07, https://edms.cern.ch/document/818463 Before Adjustment ) • Due to Beam Pipe UX85 2 & 3 (and protections) installation, no access to magnet area possible any more : New strategy for IT Survey (2 steps) • Frame survey measurements in Opened position • Frame survey measurements in Closed position 3

  4. May 21, 2007 Géraldine Conti Monday Seminar Survey in opened position : Photogrammetry (3) • Theodolite measurements of fiducial marksgive the global scale in almost closed position. • Take ~150 photographs of the frame in opened position, which contains permanent coded photo targets(20)recognized by the system. • Photogrammetric targetsare used as a reference for the IT detector boxes positions. Complete E frame geometry on precision rails obtained by the transformation of the coordinates in opened position to the coordinates in almost closed position (with a best fit 3D ). 4

  5. F6 474 475 476 F7 477 478 F5 35mm 35mm z 479 480 y 150mm CBR x 35mm 35mm CBL CBR 481 CTL CTR thickness=0.12mm thickness=0.12mm F4 TT_L TT_R 482 483 TB_L TB_R CT CB 484 485 486 486 Coded targets F3 Fiducial marks CTR 487 488 Photogrammetric targets 490 489 TB_L TB_R F1 F2 491 493 492 May 21, 2007 Géraldine Conti Monday Seminar Survey in opened position (4) View from IP : 5

  6. May 21, 2007 Géraldine Conti Monday Seminar IT Frame Survey : Results (5) • IT1A (March 30th 07) • IT2A (April 19th 07) https://edms.cern.ch/document/834051 https://edms.cern.ch/document/839426 • The most important CT_L/R and CB_L/R targets positions are adjusted thanks to crenels on the brackets. 6

  7. May 21, 2007 Géraldine Conti Monday Seminar Survey in closed position (6) • Theodolite method for the targets on the IT detector boxes and some accessible targets on the E frames.  Final measured positions of the IT detector boxes. • Possible to make the measurements from the outside of the magnet in the RICH1 region. 7

  8. May 21, 2007 Géraldine Conti Monday Seminar IT box Fiducialisation • 12 IT detector boxes to be fiducialised. • IT detector box fiducialisation test performed on Oct. 25th-26th 06. • Precision obtained during the test at 1 level is 0.05mm and 0.1mrad on the angles. • Needs for fiducialisation : • Rotating support for the box • Movable neon lights to ease the measurements of the detector crosses • Table stability (improved with long diagonal bars) https://edms.cern.ch/document/790654 8

  9. dx y (vertical) Nominal positions dy  z (along beam) dz x (horizontal)   Measured positions Offset : dPos=(dx,dy,dz) Rotation : dRot=(,,) Additional targets May 21, 2007 Géraldine Conti Monday Seminar IT Boxes Offsets in ConDB 9

  10. Offset : dPos=(dx,dy,dz) Rotation : dRot=(,,) y 130 x 127   131 126 z 134 134 142  135 Nominal positions Measured positions May 21, 2007 Géraldine Conti Monday Seminar IT sensors Offsets in ConDB 10

  11. May 21, 2007 Géraldine Conti Monday Seminar Survey Timescale • Frame Survey in Opened Position : • IT3A and ITC: • IT3A survey is forseen on Thursday 24th of May. • The ITC photogrammetric measurements should be finished up to mid-July. • Frame Survey in Closed Position : • All IT frames : • Depends on when the IT detector boxes will be finished and when the beam pipe protection will be removed. • IT Detector Box Fiducialisation : • All IT boxes : • The Fiducialisation of the first IT detector box is forseen tomorrow in the clean room at CERN! 11