70 likes | 223 Views
A 9-day old 250 ton Liebherr crane worth $3million. Did anybody look at the “Load Chart”?. “Yes! We did a pre-job safety meeting and a JSA” but a pre-lift walk through? I don’t think so….”. “How high did you want this load?”.
E N D
“Yes! We did a pre-job safety meeting and a JSA” but a pre-lift walk through? I don’t think so….”
“I know there is a rule about having a outrigger pad in place….but this is solid concrete.”