An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Activity SCOPE OF SERVICES

  2. What we do? SCOPE OF OPERATIONS

  3. Electricalinstallations C&I ElectricalInstallationsDepartment

  4. Electricalinstallations ELECTRICAL & CONTROL SYSTEMS • We construct ’turnkey’ energetic systems. • Our employees have the required qualifications. • The company is equipped withpropertools,transport resources and connectivity vital for providing services. • Rigorous checking procedures at every stage of project execution ensure a high level of performance.

  5. Electricalinstallations Organization of the department Various works – specialized employees • Managers • Engineers • Workers for: • MV systems • LV panels systems • control systems • cabling • cable connections • measuring works • earth works • installationof cable trays

  6. Service & engineering team • 24/7 – Service in Poland • 24/7 – On-calllogistic • In four working days anywherein Europe • People with necessary permissions and trainings to work offshore: • Olf Card • HUET - Helicopter Underwater Escape Training • BOSIET - Basic Offshore Safety Induction & Emergency Training

  7. C&I Projects – general scope

  8. Site organization chart

  9. That`s the way we work: • Cable trays installations: • 5 km – average length oneach Project • Average annuallyinstallation of: • Cable trays –50 km • Cables – 300 km • Busbars – 6 km

  10. That`s the way we work: LV Panels& Distribution boards installations 60 cubicles– averageannuallyinstallation ofMainLV Panels

  11. That`s the way we work: • MV Transformer Stations: • 15 MVA – annually • 30 Middle Voltagecubilces

  12. Comprehensiveprojectimplementation • BIOETHANOL PRODUCTION FACILITY • Goświnowice WIND FARM Łęki Dukielskie • 28 technological installations over an area of 11 ha • Installed power 12,8 MVA • Delivery and assembly: • 8x1,6 MVA transformers • MV 8HD10 switchgear • LV 3200A distribution boards from LV1 to LV7 Installed power 10MW Installation of 15kV internal connections Installation of 5 transformer stations Connection to National Grid

  13. Comprehensiveprojectimplementation • THERMAL-ELECTRIC POWER PLANT at PCC ROKITA • Brzeg Dolny • NGK CERAMICS • Gliwice • Design and modernization • Power station equipped with: • Two boilers • 17,5 MVA/6,3 kV generator • LV switchgears 22 cubicles, 2 ATSE, 2500A • Main MV switchgear • Installation of five 3150 kVA transformers with Siemens 5000A busbars • Installation of four 2500 kVA transformers with Siemens 4000A busbars • Installation of one1600 kVA transformers with Siemens 2500A busbars • Delivery and installation of SIMOSEC 24kV, 630 A • Prefabrication and delivery of eightunits of LV Sivacon 5000 A

  14. Comprehensiveprojectimplementation • KIRCHHOFF Polska Ltd. ASSEMBLY, Gliwice • Plant No. 1, 2, 3 and powersuplly Toyota Foundry with accompanying ACCUROMMand NTK facilities, JelczLaskowice • Installation of two 2500 kVA transformers with Siemens 4000A busbars • Installation of five1600 kVA transformers with Siemens 2500A busbars • Delivery and installation of SIMOSEC 24kV, 630 A • Prefabrication and delivery of eightunits of LV Sivacon 5000 A • Installation of six 2000 kVA transformers with Siemens 5000A busbars • Delivery and installation of SIMOSEC 24kV, 630 A • Prefabrication and delivery of eightunits of LV Sivacon 5000 A