Activity. SCOPE OF SERVICES. What we do?. SCOPE OF OPERATIONS. Electrical installations. C&I Electrical Installations Department. Electrical installations. ELECTRICAL & CONTROL SYSTEMS. We construct ’ turnkey’ energetic systems. Our employees have the required qualifications.
E N D
Activity SCOPE OF SERVICES
What we do? SCOPE OF OPERATIONS
Electricalinstallations C&I ElectricalInstallationsDepartment
Electricalinstallations ELECTRICAL & CONTROL SYSTEMS • We construct ’turnkey’ energetic systems. • Our employees have the required qualifications. • The company is equipped withpropertools,transport resources and connectivity vital for providing services. • Rigorous checking procedures at every stage of project execution ensure a high level of performance.
Electricalinstallations Organization of the department Various works – specialized employees • Managers • Engineers • Workers for: • MV systems • LV panels systems • control systems • cabling • cable connections • measuring works • earth works • installationof cable trays
Service & engineering team • 24/7 – Service in Poland • 24/7 – On-calllogistic • In four working days anywherein Europe • People with necessary permissions and trainings to work offshore: • Olf Card • HUET - Helicopter Underwater Escape Training • BOSIET - Basic Offshore Safety Induction & Emergency Training
That`s the way we work: • Cable trays installations: • 5 km – average length oneach Project • Average annuallyinstallation of: • Cable trays –50 km • Cables – 300 km • Busbars – 6 km
That`s the way we work: LV Panels& Distribution boards installations 60 cubicles– averageannuallyinstallation ofMainLV Panels
That`s the way we work: • MV Transformer Stations: • 15 MVA – annually • 30 Middle Voltagecubilces
Comprehensiveprojectimplementation • BIOETHANOL PRODUCTION FACILITY • Goświnowice WIND FARM Łęki Dukielskie • 28 technological installations over an area of 11 ha • Installed power 12,8 MVA • Delivery and assembly: • 8x1,6 MVA transformers • MV 8HD10 switchgear • LV 3200A distribution boards from LV1 to LV7 Installed power 10MW Installation of 15kV internal connections Installation of 5 transformer stations Connection to National Grid
Comprehensiveprojectimplementation • THERMAL-ELECTRIC POWER PLANT at PCC ROKITA • Brzeg Dolny • NGK CERAMICS • Gliwice • Design and modernization • Power station equipped with: • Two boilers • 17,5 MVA/6,3 kV generator • LV switchgears 22 cubicles, 2 ATSE, 2500A • Main MV switchgear • Installation of five 3150 kVA transformers with Siemens 5000A busbars • Installation of four 2500 kVA transformers with Siemens 4000A busbars • Installation of one1600 kVA transformers with Siemens 2500A busbars • Delivery and installation of SIMOSEC 24kV, 630 A • Prefabrication and delivery of eightunits of LV Sivacon 5000 A
Comprehensiveprojectimplementation • KIRCHHOFF Polska Ltd. ASSEMBLY, Gliwice • Plant No. 1, 2, 3 and powersuplly Toyota Foundry with accompanying ACCUROMMand NTK facilities, JelczLaskowice • Installation of two 2500 kVA transformers with Siemens 4000A busbars • Installation of five1600 kVA transformers with Siemens 2500A busbars • Delivery and installation of SIMOSEC 24kV, 630 A • Prefabrication and delivery of eightunits of LV Sivacon 5000 A • Installation of six 2000 kVA transformers with Siemens 5000A busbars • Delivery and installation of SIMOSEC 24kV, 630 A • Prefabrication and delivery of eightunits of LV Sivacon 5000 A