13 November 2009. Pippa Rea d Special Projects Coordinator. L&Q’s Extensions Programme. Regional Housing Pot Targeted Funding Stream 2008-2011. The Programme: a summary. £1.61 million from the TFS’s 2008-11 bidding round (entirely externally funded)

norah
Download Presentation

L&Q’s Extensions Programme

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 13 November 2009 Pippa Read Special Projects Coordinator L&Q’s Extensions Programme Regional Housing Pot Targeted Funding Stream 2008-2011

  2. The Programme: a summary • £1.61 million from the TFS’s 2008-11 bidding round (entirely externally funded) • Will deliver 20 extended properties – 3 or 4 beds on completion • 10 in 09/10 and a further 10 in 10/11 • Must house 100 people on completion i.e. 20 x 3bed 5person • Prioritises properties that provide larger family accommodation • Prioritises properties that are cost effective to convert – i.e. lofts • Properties must meet DHS on completion • Properties must also meet HCA’s DQS for rehab schemes • Tenanted properties or voids considered • Will only consider residents with a positive assessment from HM • Completes with residents in situ

  3. The money: the bid • GLA Act 2007 – new mayoral housing responsibilities • Takes lead on allocation of TFS, which provides ‘funding for programmes to address some of the most pressing housing issues within London’s existing stock’ • 5 strands, 1 being ‘increasing the number of 3 bedroomed and larger social rented homes’ • All funds (£285m) allocated via a single bidding round – 1 form! • Bids made by July 08 with confirmation in Dec 08 • Next bidding round likely to be late 10 early 11 • Money received as SHG from the HCA

  4. The money: in practice • The bid: 20 properties for £1.61 million: • £80,500 per home • £70,000 works • £10,500 on-costs • Currently (3 on-site): • £64,519 per home • £48,958 works • £15,561 on-costs • Recognised early that on-costs would be high • Consultant/HQI • Party Wall/Building Regs • Development allowances • VAT • Contingency • Works costs must be kept under control • Lofts that do not require planning permission • Helps with timescales – long process from identification to approval to SOS

  5. Identifying properties: what we were looking for • Over 30 years old • Gable end or terrace • High roof pitch • Room for additional stair core • Overcrowded if tenanted

  6. Identifying properties: the logistics • First stage filtering: • HM and PS take the lead: • PS inspected properties referred to them from HM (those registered as overcrowded on transfer list) • Voids team inspected potential voids • HM also conducted a targeted letter writing campaign to certain roads with properties considered suitable. They then filtered the results based on occupancy • Second stage filtering • Special Projects and our Consultant • Inspected the referred properties • Initial feasibility conducted • Individual submissions to HCA • Design and Standards Advisor • Bids clinic

  7. Tricky bits • Finding properties – an on-going process • Managing residents’ expectations • Internal financial/legal issues: • Outstanding mortgages • Loan covenants • Working with funders: • Not just a loft but: • HQIs – minimum room sizes/sustainability • Ancillary facilities – WCs/storage • Selecting a good consultant • Selecting a suitable contractor