90 likes | 99 Views
Stay up-to-date with the latest news and updates from CASA, including the IPAC'19 abstract deadline, travel updates, ERL mini-workshop, JLEIC and pCDR progress, accelerator/engineering division appraisals, and the upcoming Winter Celebration Party.
E N D
CASA organizational news IPAC’19 abstract deadline Travel updates FY17 PI meeting EIC combined collaboration meeting, ERL mini-workshop CEBAF update JLEIC and pCDR 100 GeV CM design Appraisals Accelerator/Engineering Division Holiday Party CASA Group Meeting November 15 2018
New PhDs! • Salvador Sosa (ODU) • Defended Nov 8 2018 • Crab Cavity Requirements for the Jefferson Lab Electron-Ion Collider • Yan Wang (ODU) • Defended Nov 6 2018 • Development of a 300 kV DC High Voltage Photogun and Beam Based Studies of Alkali Antimonide Photocathodes
IPAC’19 abstracts • Abstract deadline Wed Dec 5 2018 • About three weeks from now • Gather, distribute, coordinate abstracts before submission • Todd will work with Tristan to coordinate this for group • Time is shorter than we think with Thanksgiving week/break
Travel since last group meeting • Oct 11-20: Andrew (CERN) • DIRGEN: HL-LHC collaboration meet, transverse deflector invited talk • Oct 19-24: He (Key West, FL) • ACCTVL: ICAP’13 invited talk, FMM for Multiparticle Simulations • Oct 29-Nov 1: • JLEIC collaboration meet • ERL mini-workshop (JLab) • Nov 13-14: EIC PI exchange meeting (DC)
Approved Upcoming Travel • Dates TBD: Kevin, Yuhong, Amy (IMP) – DOE approval recently acquired • JLECIE: Bunched beam cooling experiment run (with Haipeng, Christiana) • Nov 29-30: Vasiliy (Temple, Philadelphia) • MEPCDE: Inaugural meeting of EIC polarimetry working group • Nov 27-Dec 7: Todd (Caen, France and Capetown, South Africa) • ACCTVL: IPAC’20 SPC/OC meeting and JACoW Annual Team Meeting
CEBAF Update • 4 halls routinely operational • Vertical emittance growth better after even recombiner retune Tue Nov 13 • Back to 900 kW! • Hypernuclear experiment running well • Energy change after Thanksgiving break https://accwiki.acc.jlab.org/do/view/BTeam/WebHome
JLEIC and pCDR • Draft pCDR delivered to lab leadership Oct 1 2018 • Now in “internal” reviews • Mont, Richard York, Fulvia, Bill Barletta... • Many minor revisions • FY19 revision • 100 GeV CM • 200 GeV ions: injector? • Maintan main footprint
Annual Appraisals and Performance Reviews • Division calibration meeting next week • We are a little behind, but not unusually so • Meetings with line managers before winter break https://www.jlab.org/human_resources/appraisal_system