1 / 20

AUGUST 6, 2014 | NEPOOL markets committee

AUGUST 6, 2014 | NEPOOL markets committee. Jay Dwyer. ISO New England. Conforming Changes to Manuals for Net Commitment Period Compensation Payments Tariff Changes, associated clean-up, and elimination of M-29. Conforming Manual Changes for NCPC Payments. Notes on M-29 Elimination.

norman
Download Presentation

AUGUST 6, 2014 | NEPOOL markets committee

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AUGUST 6, 2014 | NEPOOL markets committee Jay Dwyer ISO New England Conforming Changes to Manuals for Net Commitment Period Compensation Payments Tariff Changes, associated clean-up, and elimination of M-29 Conforming Manual Changes for NCPC Payments

  2. Notes on M-29 Elimination • In the course of reviewing M-29 for NCPC payments revisions, the ISO noted that all of what M-29 does is done elsewhere: • The summary of invoice is done more accurately and is updated more frequently in the Billing Job Aids on the ISO website; and • RBA is fully covered in the Tariff and M-28. • M-29’s Summary of Invoice section requires significant revision to reflect the new NCPC types. • M-29 has little or nothing to do with Market Participant actions.

  3. Manual Changes The Manual changes other than elimination of M-29 are to: • Conform the Manual language to the new NCPC provisions in the Tariff; • Correct errors and make clean-up changes; All these changes are summarized in the following slides

  4. M-11 NCPC Revisions (1 of 2)

  5. M-11 NCPC Revisions (2 of 2)

  6. M-28 NCPC Revisions Summary

  7. M-35 Revisions (1 of 8) • Several revisions to M-35 not related to NCPC or Offer Flexibility were added here.

  8. M-35 Revisions (2 of 8) • Revisions (cont.)

  9. M-35 Revisions (3 of 8) • Revisions (cont.)

  10. M-35 Revisions (4 of 8) • Revisions (cont.)

  11. M-35 Revisions (5 of 8) • Revisions (cont.)

  12. M-35 Revisions (6 of 8) • Revisions (cont.)

  13. M-35 Revisions (7 of 8) • Revisions (cont.)

  14. M-35 Revisions (8 of 8) • Revisions (cont.)

  15. M-20 Revisions for NCPC • Section 2.5 Line 5 (Section III.13.5.3) Change designation time for Supplemental Capacity Resources to match Tariff; • Defined terms Operating Day and Minimum Run Time should be capitalized (Minimum Run Time is a new defined term; Operating Day is a clean-up change).

  16. M-RPA Revision for NCPC • In Section 3.4.6.2, replace “notification period” with “Demand Resource Notification Time” to reflect revision in Section III.13.6.1.5.4.3.3 made in the Conforming Tariff changes for EMOF and NCPC.

  17. M-36 Revision for NCPC • Section 3.1 Revise the deadline for designating Forward Reserve Resources to “as provided under Market Rule 1 Section III.9.5.1”.

  18. Proposed Stakeholder Schedule • Today: Present proposed changes and red-lined Manuals to the Committee; • September: Review the actual red-lined Manuals with the Committee; • October: MC Vote on Manuals; • November: PC Vote.

  19. ISO Closing Remarks • Both the EMOF and NCPC Payments Tariff revisions are effective in December. • The NCPC Payments revisions will be made to the Manuals as revised for EMOF to be effective at the same time. • Thank you for your time and attention.

  20. Questions, comments and concerns

More Related