A. Benjamin Wager (ME) B. Michael Skube (ME) C. Matthew Greco (ME) D. James Hunt (ME)

Project Status Update II R09230: Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems. A. Benjamin Wager (ME) B. Michael Skube (ME) C. Matthew Greco (ME) D. James Hunt (ME) E. Stephen Sweet (ME) F. Joshua Wagner (ME). Roadmap Total: $12,285. Primary Budget Needs.

novia
Download Presentation

A. Benjamin Wager (ME) B. Michael Skube (ME) C. Matthew Greco (ME) D. James Hunt (ME)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Status Update IIR09230: Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems A. Benjamin Wager (ME) B. Michael Skube (ME) C. Matthew Greco (ME) D. James Hunt (ME) E. Stephen Sweet (ME) F. Joshua Wagner (ME)

  2. Roadmap Total: $12,285 Primary Budget Needs

  3. P09231 Final Project P09231

  4. P09231 Staffing Requirements P09231

  5. P09232 Final Product P09232

  6. P09232 Staffing Requirements P09232

  7. P09233 Final Project P09233

  8. P09233 Staffing Requirements ** Fabrication from all Engineers P09233

  9. P09235 Final Product • Image Source: http://www.defenseindustrydaily.com/images/AIR_F-16A_Pakistan_Bombing_lg.jpg

  10. P09235 Staffing Requirements

  11. P09234 Final Product

  12. P09234 Staffing Requirements P09234

  13. R09230 Staffing Summary