Mary Doswell Alternative Energy Solutions December 7 th , 2010. Offshore Wind Connection & Costs. Virginia Offshore Wind Integration Study. Virginia Beach Transmission System. Study Scope. Landstown Substation. Virginia Offshore Border. Offshore Transmission Station. Shore Line.
E N D
Mary Doswell Alternative Energy Solutions December 7th, 2010 Offshore WindConnection & Costs
Virginia Offshore Border Offshore Transmission Station Shore Line Distribution voltage lines Once on shore, attachment facilities could extend several more miles to point of interconnection Attachment Facilities – 15 to 25 miles just to shore line. Would be transmission voltage level and possibly need to be multiple DC lines.
Cost of New Combined Cycle Gas Turbine US EIA Annual Energy Outlook 2010