JEOPARDY DOUBLE JEOPARDY Potpourri FINAL JEOPARDY

JEOPARDY DOUBLE JEOPARDY Potpourri FINAL JEOPARDY. Asbestos Jeopardy Home. The construction asbestos standard permissible exposure limit (PEL) for an eight-hour time weighted average (TWA). $100. 0.1 f/cc. $100. The competent person on an asbestos job. $200.

nstokes
Download Presentation

JEOPARDY DOUBLE JEOPARDY Potpourri FINAL JEOPARDY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JEOPARDYDOUBLE JEOPARDYPotpourriFINAL JEOPARDY

  2. Asbestos Jeopardy Home

  3. The construction asbestos standard permissible exposure limit (PEL) for an eight-hour time weighted average (TWA). $100

  4. 0.1 f/cc $100

  5. The competent person on an asbestos job. $200

  6. One who is capable of identifying existing asbestos hazards, selecting appropriate controls, and has the authority to take corrective measures $200

  7. The agency that regulates asbestos disposal. $300

  8. Environmental Protection Agency(EPA) $300

  9. The employer activities triggered by the OSHA "action level" and/or excursion limit. $400

  10. TrainingPPE RespiratorsMedical Exams ContainmentsNegative Air Pressure $400

  11. The OSHA Construction Asbestos Standard "excursion limit" 30 minute time weighted average (TWA). $500

  12. 1 f/cc $500

  13. The type of filter that must be used for asbestos. $100

  14. HEPAor 100 $100

  15. The type of fit-test that must be done initially and every year for negative pressure respirators with a protection factor greater than 10. $200

  16. Quantitative $200

  17. The two fit-checks done every time you put on a respirator. $300

  18. Positive Seal CheckandNegative Seal Check $300

  19. The toxic gas of greatest concern when wearing an SAR? $400

  20. Carbon Monoxide $400

  21. The federal agency which approves respirators. $500

  22. NIOSH $500

  23. The three primary causes of injury on job sites. $100

  24. Slips, Trips, and Falls $100

  25. The hazard most workers should be concerned about when wearing personal protective equipment (clothing). $200

  26. Heat Related Illnesses $200

  27. The major hazard when using "wet methods" during abatement projects. $300

  28. Electrocution $300

  29. The “plan” that must be posted at all abatement sites. $400

  30. Health and Safety Plan $400

  31. The parts of a person's body the person should use to do all heavy lifting. $500

  32. Legs $500

  33. Three diseases caused by asbestos. $100

  34. AsbestosisLung CancerMesotheliomaPlural PlaquesDigestive System Cancers $100

  35. The length of time it may take for a person to develop an asbestos-related disease after being exposed to asbestos. $200

  36. Over 10 Years $200

  37. Three or more parts of a physical exam. $300

  38. Work HistoryGeneral Physical ExamPulmonary Function Test*Chest X-Ray*EKG*Sputum Cytology*Hemoccult Slide $300

  39. The two primary routes of entry that asbestos fibers take into the body. $400

  40. InhalationIngestion $400

  41. Three activities that are prohibited while wearing PPE and being in the regulated area. $500

  42. EatingDrinkingChewing Gum or TobaccoSmokingApplying Cosmetics $500

  43. A method of asbestos abatement that involves sealing the material with a coating or spray. $100

  44. Encapsulation $100

  45. The coverings placed on HVAC vents, doors, windows, and any other openings in the work area. $200

  46. Critical Barriers. $200

  47. The covering of all surfaces not being abated. $300

  48. Plasticizing $300

  49. Danger signs must be placed here before an abatement job begins. $400

  50. At all entrances to the work area $400