Update on CHANTI. F.Ambrosino , M.B. Brunetti*, F. Canfora*, T. Capussela **, D. Di Filippo, P. M assarotti, M . Napolitano, L. Roscilli , G. Saracino Università degli Studi di Napoli «Federico II» e Sezione INFN, Napoli * Undergraduate students

nura
Download Presentation

Update on CHANTI

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on CHANTI F.Ambrosino, M.B. Brunetti*, F. Canfora*, T. Capussela**, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università degli Studi di Napoli «Federico II» e Sezione INFN, Napoli *Undergraduatestudents **Former KLOE member, new Assegno di Ricerca startedSept 2011

  2. Outline • Reminder • Lessonlearned from prototype • Mechanics of the frame and of the supports • SiPMtesting • FEE and TDAQ • Perspectives

  3. π K Tracker (GTK) CHANTI: purpose and methods • Six “guard rings” to veto K inelastic interactions on GTK-3 (affecting 10-3 of kaons) • Staggered triangular scintillator bars coupled with fast WLS fibers with SiPM readout to form 6 xy planes • G4 simulation: full detector rate O(2 MHz), vetoing efficiency 99% dominated by acceptance

  4. CHANTI: prototype • Built in Naples end of July 2010 • Allbarstested for responsebeforeassemblyusing a b source • Testedusingprototype FEE for MIP response and time resolutionResultsshow O(100) pe/plane and O(1 ns) resolution. Npe

  5. Time resolution ns CHANTI: prototype • Built in Naples end of July 2010 • All bars tested for response before assembly using a b source • Tested using prototype FEE for MIP response and time resolution Results show O(100) pe/plane and O(1 ns) resolution.

  6. CHANTI prototype: lessons • Construction and test of the prototypesmooth and withinexpectations, but… • In the originalsolutionopticalglueusedalso to fixconnectors to the scintillatorbars. Apparently «clean» solution, with possibility to injectglue from below with the connectornotyetglued to the scintillator • Poormechanicalstability, after some handlingconnectors start to unglue • New solutionusing a sligthlymodified bar design, with minimalneed for glue + • + 3M «black» glueusedinstead of opticalone (better)

  7. New bar-connectorcoupling

  8. New mini prototype Built with new technique. Satisfactorymechanicalstability. Nowat LNF for FEE tests

  9. Frame and supports • Frame and suports (also for cables) desingcompleted • Allcomponents for one station built in Napoli’smechanical workshop • Wewill test the frame assoonaswebuildour first station.

  10. The vessel • Preliminary sketch of the vessel done • Contacts with Louvain, technical meeting in Napoli next week to understandconstraints and start the finalization of the design.

  11. Sensors • Wedecided to use Hamamatsu MPPC 13-50 type (1.3 X 1.3 mm^2, 50 mm pixel size) • Alreadybought and deliveredallnecessarysensors + spares (310 pcs)

  12. Knownfeatures • Hamamatsu provides some info for eachdevice. All info isrelated to operationat 25 °C • Vop (a suggestedoperationalbiasvoltage) • Gain @ Vop • 1 pe dark rate @ Vop (typicallyorder 500kHz) • 2 pe dark rate @ Vop (typicallyorder 10 kHz) …butweneed to be able to extrapolate this info atdifferenttemperatures and biasvoltages !

  13. The SiPM test station • Up to 32 sensors can be testedsimultaneously • Temperature stable and controlledwithin 0.1°C • Voltage stability O(10mV), currentsmeasuredbetterthan 1nA

  14. The SiPM test station

  15. The SiPM test station (Aka «the microwaveoven»…)

  16. Measurements • At fixed temperature I-V curve approximativelydescribed by relation • Used to extractVbd for eachsensor with an automaticfit procedure in LabView • Since gain dependslinearly on Vbias-Vbd the info atVop can be extrapolatedatanyVbiasafterVbdisknown

  17. Temperature dependence • Vbditselfdepends on temperature, and thusif the sensorisnotoperatedat 25°C thiseffect must be corrected • Weperformedmeasurements on 15 sensor of 3 differenttypesatvarioustemperatures • Quitegood «universal» slope of Vbd vs T of about 50 mV/K

  18. Temperature dependence

  19. Chanti FEE scheme • Re-use LAV ToTboards in a twolevelscheme • CHANTI boards: Set Vbias (mV), FAST amplification, Single chcurrent(nA) , readtempprobes • Design of prototypeboardstartedat LNF CHANTI boards (9X) TOT boards (9X) Vacuum vessel 16 CH 32 CH 16 CH Flange

  20. TDAQ • Currentlyprocured and switched on a TELL1 board • Boughtone TDCB + cables • D. Di Filippo at CERN to start using TEL62 , contribute to the development of the common firmware and be able to design the specific part for CHANTI. • Expectedmanpower from Electronic Service in Napoli in 2012

  21. Perspectives • The mechanical design of the CHANTI station isalmostcompleted. Construction of the first station isstartingtoday. • 3-4 weeks per station needed, includingquality test on each bar • Extensive test after first station construction, thenbuildall detector • Vessel design still to be finalized: first technical meeting next week • SiPM semi automatic test system setup . Allsensorsdelivered by Hamamatsu • FEE schemeagreed with G. Corradi. Prototypeboard in advanced design status. • TDAQ: just starting, butwehave the hardware, (and the people..) • Wewilltry to participate with a CHANTI station to the technicalrun.