1 / 10

Overview

Overview. Review ISPE tasks Process areas Implementation approach AP218 Units of Functionality subset Schedule Other issues. Steel Processing - ISPE Overview. General Objectives Enable efficient partnering among yards Decouple CAM from CAD ISPE Implementation Concept

nuru
Download Presentation

Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Overview • Review ISPE tasks • Process areas • Implementation approach • AP218 Units of Functionality subset • Schedule • Other issues

  2. Steel Processing - ISPE Overview • General Objectives • Enable efficient partnering among yards • Decouple CAM from CAD • ISPE Implementation Concept • Utilize a STEP-based CAD/CAM data exchange • Expose all manufacturing requirements and rules • Accumulate manufacturing information using neutral design and yard processes • Use ISPE as the CAM “front-end”

  3. Shop Planning Shipyard Proc Mfg Rules Steel Processing - ISPE Overview Phase 1 Phase 2 ISE Steel Proc. Adjust for Weld Shrinkage Define Edge Preparation Part Generation Create Manufac-turing Aids Reports and Drawings CATIA v4 export ISPE Repository Simulation AP218 Validation Manufactur-ing Data CATIA v5 export AP218 (Ship Structures) AP218 AP238 (STEP-NC) Config Mgt Robotic Welding Tribon export Nesting AP216 (Ship Molded Forms) Intergraph export Manufactur-ability Analysis MRP Interface

  4. From ISPE Phase 0 ConOps

  5. Process Areas • Automate the creation of manufacturing product model • Relates to manufacturing engineering • Affected data: • e.g., weld shrinkage/fit-up allowances, part generation, etc. • Automate the application of yard/shop specific processes • Relates to work share/internal routing • Affected data: • e.g., part edge definition, weld process, labels, fabrication, etc. • Collaboration/Change Management environment

  6. Recommended Approach • Identify target systems • What data within 218 is required? • Identify Representative data set • Export from ISDP • One that highlights work sharing issues • Is there any information to add/modify that would help the conversion to 238? • Determine the current process, used within target yards, to convert the data • Use this process, and the underlying required information, to influence the Mfg Rule/Process schema • Identify attributes/constructs with AP 218 (216?) that are yard/shop dependent

  7. Units of Functionality • definitions • product_structures • ship_manufacturing_definitions • structural_features • structural_parts • welds

  8. Application Objects • manufacturing_definition • assembly_manufacturing_definition (assembly_method, assembly_stage) • structural_part_manufacturing_definition • weld_manufacturing_definition • item_structure • item_relationship • feature_relationship, • structural_feature_relationship • part_relationship • structural_part_relationship • plate_relationship • plate_boundary_relationship • profile_relationship • system_relationship, structural_system_penetration_relationship, structural_part_penetration_relationship, assembly_relationship • structural_part_joint • structural_part_connection_implemenation • structural_feature • structural_manufacturing_feature • feature_design_definition • corner_cutout_design_definition • bevel_design_definition • shear_bevel_design_definition • structural_part_joint_design_definition

  9. Schedule 1st Qrtr 2nd Qrtr 3rd Qrtr 4th Qrtr F M A M J J A S O N D J Sys Req/Schema Dev System Arch Detailed Design System Implementation Providence, RI visit Integ. & Test Groton, CT visit Internal Review Rqts Review Technical Exchange Progress Review Design Review Progress Review Progress Review Kick-off Mtg Readiness Review Demo Meetings Deliverables System Requirements System Architecture Detailed Design Schemas, Usage Guides Reports 1st Qtr Report 2nd Qtr Report 3rd Qtr Report Final Report Co-located Distributed

  10. Other Issues • Final Agreement • Invoices • Format for Quarterly Reports • Delivery of Milestone Deliverables • Steel Processing support from Ingalls/Avondale

More Related