1 / 11

INFOMØTE 22.MARS

INFOMØTE 22.MARS. INNFØRING AV ASAP NYTT VFR MØNSTER RY. 7. April 2011. Oslo ASAP AIRSPACE Operational objectives:. Oslo ASAP is intended to develop a new airspace structure within the Oslo AoR, including SIDs and STARs for Oslo and Farris TMA.

nusa
Download Presentation

INFOMØTE 22.MARS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INFOMØTE 22.MARS INNFØRING AV ASAP NYTT VFR MØNSTER RY

  2. 7. April 2011

  3. Oslo ASAP AIRSPACE Operational objectives: • Oslo ASAP is intended to develop a new airspace structure within the Oslo AoR, including SIDs and STARs for Oslo and Farris TMA. • Ensure adequate capacity in Oslo and Farris TMAs and in Oslo ACC while keeping: • Safety at a high standard; • Controllers’ workload at an acceptable level. • Ensure efficiency of operations so as to: • Reduce CO2 emission; • Accommodate Noise Abatement Procedures (ENGM).

  4. S7 S1 S2 S6 S3 S5 S4 S8 OSLO and Farris TMAs Sectorisation ACC Proposed Sectors and Positions DIR (DIRW / DIRE) FIN APP WEST APP EAST FARRIS WEST FARRIS EAST 134,05 124,35 (FARRIS)

  5. Principles of Point Merge

  6. FL100 FL110 FL120

  7. ENTO RWY 36

  8. ENRY RWY 30

  9. 592941N 0103745E TOR R 030 22,5NM BEVØYA MAX 1000 592702N 0105116E TOR R 047 24,7NM BUKTEN MAX 1500 MAX 1500 591740N 0104458N TOR R 063 16,7 NM SALTNES

More Related