Risk-Based Supplier AssuranceA Missing KeyTo Enhanced Supplier Quality Program Success Quality Assurance and Risk Management Services, Inc. Robert J. Navarro, President & CEO A.A. Flippen, Director, Systems Engineering University of Bradford, UK School of Engineering, Design & Technology Chakib Kara-Zaitri, PhD, Senior Lecturer in Risk & Reliability September 28, 2008
Presentation Objectives • Quality & Risk Management Process Today • Where We Want to Be • How Do We Get There? • Case Study • Summary
Where We Are Today Quality Community You Are Here • Quality System Elements • Management responsibility • Purchasing / Supply chain management • Product realization • Control of non-conforming products • Etc.
Where We Are Today Risk Management Community NPR 8000.4 Agency Risk Management Procedural Requirements • Includes supply chain risk “They” Are There
Where We Want To Be Risk Management Community Supplier Quality Community • Integration of Quality and Risk Management • Current focus of this initiative on supply chain QA management • Supplier QA risks typically reported in supplier audit reports • Transformation of quality audit deficiencies into a risk management framework • Systematic reporting of supply chain risks as part of the program/project management councils (PMCs)
How Do We Get There? • An Approach for Integration • Program/Project risk management is governed by the NASA Risk Management Policy NPR 8000.4 • Includes the Continuous Risk Management (CRM) Process • The CRM process requires program/project risk management plans to provide definitions for likelihood and consequence ratings • Apply these definitions to each supplier audit finding • Map results in the traditional 5X5 Risk Reporting Matrix • Report significant supply chain QA results as part of an integrated reporting process at program/project PMCs
Case Study Likelihood & Consequence 5X5 Matrix Likely to Occur Probably May Occur Unlikely to Occur Improbable Likelihood Very Low Mod High Very Low High Consequence
Case Study, cont’d Definitions • Likelihood • A. Likely to occur (e.g., probability > 0.1) • B. Probably will occur (e.g., 0.1 > probability > 0.01) • C. May occur (e.g., 0.01 > probability > 0.001) • D. Unlikely to occur (e.g., 0.001 > probability > 0.000001) • E. Improbable (e.g., 0.000001 > probability) • Consequence • Very High -- A condition that may cause death or permanently disabling injury, facility destruction on the ground, or loss of crew, major systems failure, or vehicle during the mission • High -- A condition that may cause severe injury or occupational illness, or major property damage to facilities, systems or major impact to project schedule • Moderate -- A condition that may cause minor injury or occupational illness, or minor property damage to facilities, systems or minor impact to project schedule • Low -- A condition that could cause the need for minor first aid treatment but would not adversely affect personal safety or health, damage to facilities, equipment, or flight hardware • Very low --Minimal or no consequences
Case Study, cont’d • An audit was completed for Supplier A. Selected results: • F1. Supplier A does not have a defined receiving inspection process to systematically: • Verify the conformity of purchased products and services • Provide a traceable record of conformity including who, when, how, and to what criteria, conformity was verified • Project Risk • Purchased products may not meet technical requirements, and may have no traceable record of conformity to requirements. Failures could occur downstream and result in costly delays. • Consequence • High - A condition that may cause severe injury or occupational illness, • or major property damage to facilities or systems or major impact to project schedule • Likelihood • C - May occur
Case Study, cont’d Transformed Supplier Risk Supplier “A” Risk Report Likely to Occur Probably May Occur Unlikely to Occur Improbable F1 Likelihood Very Low Mod High Very Low High Consequence
Case Study, cont’d F2. While performance history is cited as a basis for approving suppliers, there appears to be no defined process for reporting supplier deficiencies that could affect supplier approval status. Project Risk Repeat problems with subcontracted and/or purchased products. Initial supplier deficiencies may not be recorded and/or addressed with appropriate controls. Consequence Moderate - A condition that may cause minor injury or occupational illness, or minor property damage to facilities, systems or minor impact to project schedule. Likelihood C - May occur
Case Study, cont’d Transformed Supplier Risk Supplier “A” Risk Report Likely to Occur Probably May Occur Unlikely to Occur Improbable F2 F1 Likelihood Very Low Mod High Very Low High Consequence
Case Study, cont’d F3. It appears that there is no defined process for reviewing controlled documents to determine whether updating is needed. Project Risk Incorrect builds, tests and inspections could occur due to use of outdated material and process specs, and manufacturing and QA work instructions. Consequence High - A condition that may cause severe injury or occupational illness, or major property damage to facilities, systems or major impact to project schedule Likelihood B - Probably will occur
Case Study, cont’d Transformed Supplier Risk Supplier “A” Risk Report Likely to Occur Probably May Occur Unlikely to Occur Improbable F3 F2 F1 Likelihood Very Low Mod High Very Low High Consequence
Summary • Supplier risks can and should be integrated into the NASA risk management program defined in NPR 8000.4 (new revision in NODIS review) • A systematic and practical risk-based supplier QA process can be applied • Integrated quality and risk management • Supply chain risks are a critical element of the integrated project risk profile • Next steps • Field testing for practicality • Program and project feedback