gLite IPv6 compliance project tests Further evolution of the ETICS-based IPv6 tests. EGEE SA2/EuChinaGRID/ETICS 2 nd IPv6 meeting Lyon, 17 April,2007 Mario Reale – GARR Xavier Jeannin – UREC Marian Zurek - CERN. Outline. Content Current testbed Testing activity so far Next steps.

nyla
Download Presentation

gLite IPv6 compliance project tests Further evolution of the ETICS-based IPv6 tests

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. gLite IPv6 compliance project tests Further evolution of the ETICS-based IPv6 tests EGEE SA2/EuChinaGRID/ETICS 2nd IPv6 meeting Lyon, 17 April,2007 Mario Reale – GARR Xavier Jeannin – UREC Marian Zurek - CERN

  2. Outline • Content • Current testbed • Testing activity so far • Next steps EGEE SA2/EUChinaGRID WP2/ETICS FtF Meeting – Feb 19-20, 2007 , Roma

  3. Current EGEE SA2 IPv6 glite testbed • 3 sites : UREC, GARR, CERN( ETICS production) • UREC • 2 nodes • BD-II Top Level • IP : NAT-PT / dual stack / IPv6 only / IPv4 only • GARR • 10 nodes (VMware, 8 SCL 3.0.8, 2 SLC 4.0.4 ) • UI,WMS,LB,CE,WN, RGMA, BDII, SE, VOMS • IP: dual stack / IPv6 only / IPv4 only • NAT-PT being set up at natpt.dir.garr.it • There’s a new SLC 4 UI working at dev-4.dir.garr.it • CERN • ETICS NMI/Condor production infrastructure • Around 40 nodes / different platforms • No IPv6 stack so far • Job migration between UoW and INFN in coming weeks • m/w branches: • Security AAA components modules (VOMS) • Workload Managements modules ( WMS, LB, CE, WN, Torque, UI ) • Information System modules (BD-II, RGMA) • Data Management modules ( Classic SE ) EGEE SA2/EUChinaGRID WP2/ETICS FtF Meeting – Feb 19-20, 2007 , Roma

  4. UREC site • UREC • Includes the NAT-PT router for IP protocol translation • IPv6 clients can connect IPv4 servers and vice versa • To validate the proposed testing methodology • Currently deploying a gLite top-level BD-II EGEE SA2/EUChinaGRID WP2/ETICS FtF Meeting – Feb 19-20, 2007 , Roma

  5. UREC site EGEE SA2/EUChinaGRID WP2/ETICS FtF Meeting – Feb 19-20, 2007 , Roma

  6. GARR site • GARR • Based on Virtual Nodes VMWare • easy to maintain, update, backup, migrate nodes • Managed from a central node( via SSH key) through scripts for • installing gLite on the nodes ( altern. to manual local install on the node) • pushing gLite updates via APT • IPv management / network configuration (netproto-switcher.sh) • All nodes have double IP address (IPv4 and IPv6) and are registered on the dual stack DNS server • CERN • The whole ETICS production infrastructure • etics.cern.ch EGEE SA2/EUChinaGRID WP2/ETICS FtF Meeting – Feb 19-20, 2007 , Roma

  7. GARR site EGEE SA2/EUChinaGRID WP2/ETICS FtF Meeting – Feb 19-20, 2007 , Roma

  8. CVS • We have a CVS now at org.glite.testsuites.ipv6 • access requires providing AFS id EGEE SA2/EUChinaGRID WP2/ETICS FtF Meeting – Feb 19-20, 2007 , Roma

  9. testing activity so far • “gLite IPv6 compliance” ETICS project set up • 3 registered users/admins • org.glite.testsuites.ipv6 test component created • succeeded in the first demo test job • Manually pre-installed BD-II server in Paris ( using ext.testbed) • Test commands defined within ETICS gLite IPv6 compliance project • ldap query to the top level IPv6 BD-II in Paris(UREC) from the IPv4 NMI node (CERN) • Both client CLI submisison and remote test via Web Application successfully exploited EGEE SA2/EUChinaGRID WP2/ETICS FtF Meeting – Feb 19-20, 2007 , Roma

  10. underlying idea behind the testing developers ETICS TESTBED IPv4 / IPv6 EGEE SA2/EUChinaGRID WP2/ETICS FtF Meeting – Feb 19-20, 2007 , Roma

  11. testing activity so far: UI install • tried SLC 4 installation via gLite SA3 tarball within an ETICS job • failed • install_certs_userspace YAIM function failed • “couldn’t download CA rpms” • a debugging test job with only the failing “wget ca_*.rpm” code was successful : further debugging required EGEE SA2/EUChinaGRID WP2/ETICS FtF Meeting – Feb 19-20, 2007 , Roma

  12. Next Steps in the testing activity • Install UI via ETICS job • Involve other external testbed components • WMS, RGMA, LFC • let WMS in GARR point to the BD-II in UREC and try glite-job-list-match and glite-job-submit • try using rgma client commands from the UI on the ETICS NMI node via an etics test job • try file registration using and LFC catalog (to be installed) on the classic SE at GARR • Try the complete set up (install & config) of glite metapackages on ETICS nodes • get ready for the D-day when we’ll deploy IPv6 compliant servers  EGEE SA2/EUChinaGRID WP2/ETICS FtF Meeting – Feb 19-20, 2007 , Roma