1 / 17

Uncertainty of runoff flow path on a small agricultural watershed

Unit of Soil and Water System Departement of Environment Science and Technology Gembloux Agro-Bio Tech – University of Liege. Uncertainty of runoff flow path on a small agricultural watershed. Ouédraogo M. Plan. Context Objectives Modeling uncertainty Some results Conclusion.

Download Presentation

Uncertainty of runoff flow path on a small agricultural watershed

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Unit of Soil and Water System Departement of Environment Science and Technology Gembloux Agro-Bio Tech – University of Liege Uncertainty of runoff flow path on a small agricultural watershed Ouédraogo M.

  2. Plan • Context • Objectives • Modeling uncertainty • Some results • Conclusion

  3. Context • Consequences: • Cleanningcost: 11000 € • Soilloss economic impact for farmers • Stressfull for population Frequency of muddy floods over a 10-year period in all municipalities of the study area; data for Wallonia (1991–2000) taken from Bielders et al. (2003), data for Flanders (1995–2004) derived from a questionnaire sent to all municipalities in 2005. O. Evrard, C. Bielders, K. Vandaele, B. van Wesemael, Spatial and temporal variation of muddy floods in central Belgium, off-site impacts and potential control measures, CATENA, Volume 70, Issue 3, 1 August 2007, Pages 443-454, ISSN 0341-8162, 10.1016/j.catena.2006.11.011.

  4. Context GPS, Topographic cards, Aerial and Terrestrial scanning, Aerial Photogrammetry… Elevation data DEM Errors • How can we model the impact of errors?

  5. Objectives • Analyze uncertainty of runoff flow path extraction on small agricultural watershed • Determine how uncertainty is depending on DEM resolution • Determine wether uncertainty is depending on the algorithm

  6. Modeling uncertainty • Test area • Area:12 ha • Elevations:159 -169 m • Mean slope: 3.67%

  7. Modeling uncertainty • Digital Elevation Model (DEM) • 14 stations 1 m x 1 m 2 m x 2 m 4 m x 4 m 3 DEMs

  8. Modeling uncertainty • Monte Carlo simulation • Purpose: Estimate original DEM errors , GenerateequiprobableDEMs , semivariance mean , variance 1098 GCPs

  9. Modeling uncertainty • Purpose: Estimate original DEM errors and GenerateequiprobableDEMs • Digital error model generation • Idea: visite each pixel of terrain model and generateerror value • Generation uses kriging interpolation (mean, variance, semivariance) • Adderror model to original DEM to obtainsimulated DEM + Original DEM Digital error models Simulated DEMs

  10. Modeling uncertainty • Applyrunoff flow path extraction algorithms on simulatedDEMs • Consider pixel as Bernoulli variable i.e. value=1 or 0 • Compute for each pixel the number of times (nb) it has been part of runofffowpath • Defineprobability P=nb/N (N is the number of simulatedDEMs) 1 0

  11. Modeling uncertainty • Definerandom variable D as distance from pixels (p>0) to extracted flow path • Compute cumulative distribution function i.e. P (D<=d) • Objective: allow a user to define area whichwillcontain flow path • With a givenprobability

  12. Modeling uncertainty • Tools for modeling uncertainty • Whitebox GAT library for runoff flow pathalgorithms • Programmingautomatedtasksisdone in Neatbeans • R : geoR and gstat • for DEMs simulations (1000)

  13. Some results • Pixels probabilityincreaseswith DEM resolution • Runoff flow path position is more variable for 1 m x 1 m • Certainly due to microtopography 1 m x 1 m 2 m x 2 m 4 m x 4 m

  14. Some results • Cumulative distribution function of D 1 m x 1 m

  15. Some results

  16. Conclusion • Monte Carlo ispowerfull • Usefull, specially for massive data collection tools • However, verydifficult to beimplemented • Limitation with commercial algorithms • Need to computeautomatedtasks • Computing time canbevery long • Nextstep: compare the results of differentalgorithms

  17. Thank you

More Related