2. Agenda. POM Process Review POM 10 Outcome POM Transition to Budget Cycle Development and maintenance of Ceiling Tracks How and why your Tracks Change Future Improvement Efforts. 3. Program Objective Memorandum (POM) . What is it? A six year plan (2010-2015)?product of PPBE process How
E N D
2. 2
3. 3 Program Objective Memorandum(POM)
4. 4 POM Initiative Process
5. 5 POM 10 Assumptions Fiscal Guidance received will hold up
Additional Topline expected
Not a Show-Stopper if not received
GWOT in ’10 a Question Mark
BIG issues will be addressed above Core
6. 6
7. 7 P&R Guidance30 Mar 3 Essential Tasks
Pay Corporate Bills w/in current TOA
Non-negotiable
Rack & Stack
Billpayers
Unfundeds
Build POM COA to “Fiscal Guidance”
Based on latest Intel
Put on our MAGTF Hat
Corporate Perspective
8. 8 POM-10 Redlines GTF/202K – 3 Balanced MEFs
2+0 BEQ – Continue Plan
Family Readiness / Wounded Warrior
Infrastructure Sustainment
Maintain F-35B FY12 / CH53K FY15 IOC’s
Maintain MV-22 Two Squadron per Year Transition
Restore HMLA PAA
Provide Increased Aviation Survivability Equipment
9. 9 CMC POM 10Guidance Achieve victory in the Long War
Right-Size the Corps
Provide a multi-capable Naval force fully prepared for conflict
Resetting today, while modernizing for tomorrow
Improve quality of life for Marines & families
10. 10 SECNAV POM 10Guidance Provide a Total Naval Workforce capable and optimized to support the National Defense Strategy.
Use the Navy-Marine Corps Team to aggressively prosecute the Global War on Terrorism.
Build the Navy-Marine Corps Force for Tomorrow.
Safeguard the People and Resources of the Navy-Marine Corps Team. Integrate Safety and Risk Management into all on and off-duty evolutions to maximize mission readiness and to establish DON as an organization with world class safety where no mishap is accepted as the cost of doing business.
Strengthen ethics as a foundation of exemplary conduct within the Department of the Navy.
Provide first-rate facilities to support stationing, training and operations of Naval forces.
11. 11 USMC POM-10 Achievements Personnel
GTF ahead of schedule
Procurement
Mitigated risk in PMC accounts
Readiness
Wounded Warrior
Family Readiness
Equipment Sustainment
Infrastructure
2+0 BEQ plan for 202K on track for FY14 completion Personnel
“GTF Ahead of schedule”
202K in FY09
Asking for $1.6B (EB/SRB/Acceleration costs) “Above Core”
If not received:
Will ask for FY10 $ in GWOT Request
Can fund FY11-15 by lowering the “Buy Back” cut-line
Procurement
“Mitigated risk in PMC accounts”
$1.5B of fiscal guidance applied to PMC accounts
Helps recover from past cycles of “billpaying”
Readiness
FY10 Equipment Sustainment (examples):
Blue Force Situational Awareness (BFSA)
Distributed Common Ground Station-MC (DCGS-MC)
Global Combat Support System –MC (GCSS-MC)
Technical Control & Analysis Center (TCAC)
FYDP Equipment Sustainment (examples): :
Logistics Vehicle System Replacement (LVSR)
Light Armored Vehicle Modifications
Marine Air Command & Control System (MACCS)
Automatic Identification Technology
Blue Force Situational Awareness (BFSA)
Distributed Common Ground Station-MC (DCGS-MC)
Global Combat Support System –MC (GCSS-MC)
Infrastructure (2+0 BEQ Plan)
Manspaces (24,162) >BEQs (60):
FY08 = 4,250 FY08 = 10
FY09 = 12,160 FY09 = 30
FY10 = 1,597 FY10 = 4
FY11 = 5,170 FY11 = 13
FY12 = 45 FY12 = 1
FY13 = 940 FY13 = 2
Personnel
“GTF Ahead of schedule”
202K in FY09
Asking for $1.6B (EB/SRB/Acceleration costs) “Above Core”
If not received:
Will ask for FY10 $ in GWOT Request
Can fund FY11-15 by lowering the “Buy Back” cut-line
Procurement
“Mitigated risk in PMC accounts”
$1.5B of fiscal guidance applied to PMC accounts
Helps recover from past cycles of “billpaying”
Readiness
FY10 Equipment Sustainment (examples):
Blue Force Situational Awareness (BFSA)
Distributed Common Ground Station-MC (DCGS-MC)
Global Combat Support System –MC (GCSS-MC)
Technical Control & Analysis Center (TCAC)
FYDP Equipment Sustainment (examples): :
Logistics Vehicle System Replacement (LVSR)
Light Armored Vehicle Modifications
Marine Air Command & Control System (MACCS)
Automatic Identification Technology
Blue Force Situational Awareness (BFSA)
Distributed Common Ground Station-MC (DCGS-MC)
Global Combat Support System –MC (GCSS-MC)
Infrastructure (2+0 BEQ Plan)
Manspaces (24,162) >BEQs (60):
FY08 = 4,250 FY08 = 10
FY09 = 12,160 FY09 = 30
FY10 = 1,597 FY10 = 4
FY11 = 5,170 FY11 = 13
FY12 = 45 FY12 = 1
FY13 = 940 FY13 = 2
12. 12 Compliance CMC
Build 3 Balanced MEFs (202k)
Attain 2+0 BEQ Plan
Grow 2 x MV-22 Squadrons/year
Fund Family Readiness
SecNav
Provide a Total Naval Workforce
Prosecute GWOT
Build the Navy-Marine Corps Force for Tomorrow
Safeguard People and Resources
Provide first-rate facilities
OSD
JPGs (JTRS, S&T, BRAC, Facilities Sustainment) JPG Notes:
Joint Tactical Radio System
JPG II directed funding to APB quantities
Science & Technology
Extended FY09-13 FYDP to FY14/15
Applied Research & Advanced Technology Demonstrations
BRAC
Fund BRAC V
Facilities Sustainment
Fund facilities sustainment model; minimum 90%
JPG Notes:
Joint Tactical Radio System
JPG II directed funding to APB quantities
Science & Technology
Extended FY09-13 FYDP to FY14/15
Applied Research & Advanced Technology Demonstrations
BRAC
Fund BRAC V
Facilities Sustainment
Fund facilities sustainment model; minimum 90%
13. 13 What’s In/Out FY10 Operations & Maintenance
Equipment Sustainment
Blue Force Situational Awareness (BFSA)
Distributed Common Ground Station-MC (DCGS-MC)
Global Combat Support System –MC (GCSS-MC)
Technical Control & Analysis Center (TCAC)
Wounded Warrior Regiment (WWR)
Family Readiness
Marine Corps Network Operations Security Command (MCNOSC)
Naval Reserve Officer Training Corps (NROTC)
Marine Corps University (MCU)
Ground Combat Element (GCE)/ Logistics Combat Element (LCE) WTTPs
Procurement / R&D
Recolor of PMC to O&M for sustainment of Warfighting programs
Ammo Risk
MILPERS
GTF Acceleration
Family Housing realignment for BAH (PPV at 29 Palms)
MILCON/Family Housing
BEQ Spaces FY10 = 1,597
Family Housing realignment for BAH (PPV at 29 Palms)
14. 14 What’s In/Out FYDP Operations & Maintenance
Equipment Sustainment
Logistics Vehicle System Replacement (LVSR), Light Armored Vehicle Modifications
Marine Air Command & Control System (MACCS)
Automatic Identification Technology, Blue Force Situational Awareness (BFSA)
Distributed Common Ground Station-MC (DCGS-MC), Global Combat Support System –MC (GCSS-MC)
WWR, Family Readiness, MCNOSC, NROTC, MCU, GCE/LCE WTTP
Procurement / R&D
Vehicles
Joint Light Tactical Vehicle (JLTV ), Expanded Capacity Vehicle (ECV), LVSR
Weapons Systems:
Sniper Capability Sets, Tier II UAS, Common LASER Range Finder, Identity Dominance (Biometrics), Expeditionary Fire Support System (EFSS), CREW
MILPERS
GTF Acceleration, Family Housing realignment for BAH (PPV at 29 Palms)
MILCON/Family Housing
BEQ Spaces (7,752)
FY10 = 1,597
FY11 = 5,170
FY12 = 45
FY13 = 940
Family Housing realignment for BAH (PPV at 29 Palms)
15. 15 Current Status MILCON Shortfalls:
- JSF Facilities
- Quality of Life projects
> Libraries
> Collateral Equipment
> Misc MILCON tails
Tactical Mobility Shortfalls:
- ECV
- MTVR armor & modifications
- Tank, LAV, AAV Survivability Equipment & Modifications, Armored Counter-IED equipment
MILCON Shortfalls:
- JSF Facilities
- Quality of Life projects
> Libraries
> Collateral Equipment
> Misc MILCON tails
Tactical Mobility Shortfalls:
- ECV
- MTVR armor & modifications
- Tank, LAV, AAV Survivability Equipment & Modifications, Armored Counter-IED equipment
16. 16 Major Accounts USMC FY-10 = $27.4B (includes 202K increase)MFP FY-10 = $1,074M
17. 17 Program Evaluation Boards(PEB) PEBs established to compare like initiatives
SMEs assigned by Advocate and Sponsor (OpBud Holder)
HQMC, MCSC, OpFor
Understand Cdr’s Intent
Rely on Professional Judgment to build consensus of priorities
Output is ranking of all initiatives
Normalized relative benefit value
Supported by significant remarks
7 PEB lists forwarded to the PWG
HQ & Other Support
Installations
Manning
Operating Force Readiness
Sustainment
Training
Warfighting Expanded due to advocacy
LCMI = Life Cycle Management InvestmentExpanded due to advocacy
LCMI = Life Cycle Management Investment
18. 18 How do your initiatives get Funded by the PEB?
19. 19 POM Working Group (PWG)
20. 20 How do your initiatives get Funded by the PWG?
21. 21 MARFORPAC O&MPOM Results
22. 22 POM PROCESS TIMELINE
23. 23 POM Translates to Budget Tracks
24. 24 Why doesn’t my Budget reflect what I asked for/received in the POM Process?
25. 25 When can Ceiling TracksChange?
26. 26 Budget PROCESS TIMELINE
27. 27 Budget PROCESS TIMELINE(a longer view)
28. 28 Mid Year Review/CYD
29. 29 Process Improvements
30. 30 Questions?