1 / 10

Status of calibration target for Three Springs Cell

Group B Calibration Target - Three Springs, Weatherby Springs, Hoagland Tunnel and Spring Creek Spring Presented by Jennifer Sukow, IDWR October 27, 2011. Status of calibration target for Three Springs Cell.

oceana
Download Presentation

Status of calibration target for Three Springs Cell

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Group B Calibration Target - Three Springs, Weatherby Springs, Hoagland Tunnel and Spring Creek Spring Presented by Jennifer Sukow, IDWR October 27, 2011

  2. Status of calibration target for Three Springs Cell • Last meeting we discussed problem with Covington & Weaver values used in superseded Group C target for this spring cell • Committee requested that IDWR compile a transient target for this cell • IDWR compiled data from records previously submitted to IDWR and posted draft memo & spreadsheet on September 19. • John Koreny and the Jones Hatchery provided more detailed records to IDWR between Oct. 7 and Oct. 17, which facilitated correction of some of the previously reported data • IDWR posted revised draft memo & spreadsheet on October 21.

  3. Springs in ESPAM2 model cell 1041013

  4. Data Availability • Three/Weatherby/Hoagland Tunnel Complex Discharge (+) Jones Hatchery diversions (1975-2010) (+) Three/Weatherby Pipe diversion (1996-2009) (-) Jones Hatchery inflow from Three/Weatherby Pipe (1980-2006) (+) Hoagland Tunnel Ditch diversion (2005-2008) (+) Undiverted flow at lower Weatherby Spring (8/26/1993; 6/22/2005) • Spring Creek Spring (+) Lee Hatchery (1995-2009) (+) Spring Creek Spring Pipe (7/2004) (+) Musser Pump (annual volume from PCC for 1995-2010) • Cell Target is the sum of 8 quantities (user reported & estimates)

  5. Three/Weatherby/Hoagland Tunnel Diversions – 2005

  6. Three/Weatherby/Hoagland Tunnel Complex

  7. Spring Creek Spring

  8. Cell 1041013 Calibration Target

  9. Comparison with Curren Tunnel Calibration Target

  10. End of Slides

More Related