1 / 17

The project company for the production of wind farm based generators with high magnetic saturation

The project company for the production of wind farm based generators with high magnetic saturation. Author of the project: Likhachev VB. Организация производства по изготовлению ветро-электро станций (ВЭС) с учетом особенностей Красноярского края. Цель проекта:.

oded
Download Presentation

The project company for the production of wind farm based generators with high magnetic saturation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The project company for the production of wind farm based generators with high magnetic saturation Author of the project: Likhachev VB

  2. Организация производства по изготовлению ветро-электро станций (ВЭС) с учетом особенностей Красноярского края. Цель проекта:

  3. air masses Krasnoyarsk (3-5 m / s.). existing windfarm not able to work on the wind flow. Проблема

  4. 1. Voltage 380/220 Volts; 2.chislo rpm - 200 rpm; 3.moschnost 450 watts; 4. modular design. 5. Nominal flow air mass 4.5 m / sec The solution: Wind turbines with enhanced magnetic saturation of modular type.

  5. Rated power at a wind speed of 4.5 m per second. • Implemented a modular version • Dramatically different in a 3.5-fold in terms of specific characteristics. • The absence of magnets, not razmagichivaetsya. • Shelf life is unlimited. • 1.0 mW, prevents emissions: •          1800 tons - CO2 •         9 tons - SO2, •              4 tons of nitrogen oxides. Сompetitive advantage

  6. The general scheme ofconnections

  7. 1.Private sector: cottages, villas, travelers. 2.Geologists. 3.MOE, the IMF.  4.Farm. 5.Residents of remote villages. 6.Gas companies (cathodic protection). 7.Other consumers with a power consumption of 1.5 mW and more in the order of the wind farm. Potential buyers

  8. Projected sales

  9. Project performance indicators

  10. Stage I: Starting patent, design, design. Contracts and agreements. $ 1000000 Start Up + $ 3000000 USA Stage II:      purchase of production equipment, payment of contracts, transportation and delivery of equipment, rental of production space. $ 7000000 USA Всего $ 1+10 000000 USA, под 3,6 % годовых. Stage I What is required of KGAU"KRITBI"? 1. Search for lenders and investors.

  11. Limited Liability Company • "LLC Morning Breeze" • Location: Russia, Krasnoyarsk. • Project presented: Likhachev VB •                 8-903 920 7642 •        E-mail: morningbreezy@mail.ru • Krasnoyarsk, 2012g

  12. Enterprise of "Morning Breeze" • We accept orders for manufacturing, installation and commissioning. •                 WPP-500. (KW) • Price based per 1 kW of generating capacity - 3000 euros. • Party: 3, 5, 10, pcs. • By making a contract. Director of "Morning Breeze" Likhachev VB

  13. Enrgeticheskaya column. Project.

  14. Acting Hydraulic generator for supplying Bakinfarvatetera Yenisei ENURPa

  15. Спасибо за внимание

More Related