1 / 25

Dijana Klarić

RC LACE 2005. Regional LAM Co-ordination and Co-operation of A, CR, CZ, H, SI, SK. Dijana Klarić. RC LACE highlights 2005.  Operations & maintenance  Networking  Research & development  Plans for 2006-2007. Operations & maintenance.

odelia
Download Presentation

Dijana Klarić

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RC LACE 2005 Regional LAM Co-ordination and Co-operation of A, CR, CZ, H, SI, SK Dijana Klarić RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  2. RC LACE highlights2005 Operations & maintenance  Networking Research & development Plans for 2006-2007 RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  3. Operations & maintenance all 6 members - individual operational applications almost the same domains mesh size (x 12.2km - x 6.5 km) vertical resolutions (L37 - L45) 00 and 12 UTC runs per day 06 and 18 UTC runs on demand envelope - no envelope orography dyn. adapt; blending; 3DVar (e-suite) maintenance and porting of SW RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  4. Networking in 2004/2005 (Who? Why? When?) • AAAA settings and definitions • Intermediate ALADIN WP for 2005 • Opened subjects Cost/efficient of new physics Interfacing internal and external Data formats • Mobility of scientist • ALADIN- HIRLAM Partnership RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  5. ALADIN Assembly HIRLAM Council UpdatedCSSI: 2 RC LACE 2 Météo-France 2 ALADIN-n-n Management Group 1 joint session/year => scientific plan for common actions HAC (1 M-F, 1 ALADIN-n) LACE-SC (1 M-F, Common maintenance (GMAP/D) 1 ALADIN-n-n, 1 HIRLAM) All staff meeting ALADIN Workshop ‘Consistency check’ HIRLAM-PL/GMAP-D/ALADIN2-C A proposal for planning and supervision of the HIRLAM-AROME-ALARO common work Observer Work plans RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  6. Scientific Plan 2004/2005 4nd RC LACE Steering Committee meeting Opened to no-LACE partners 2004 • Plans from year 2004 were fulfilled • 100 person/months 2005 • 110 person/months • to adjust R&D to AAAA plans RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  7. Scientific Plantoward AAAA compatibility • Dynamics • NH ALADIN is numerical core • interfacing dynamics vs. physics is in focus • Physics • Fast development • ALARO prototype as target • Data Assimilation • more meso-scale RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  8. Working Group forDynamics and Coupling . Non-hydrostatic dynamics Interative schemes Choice of additional NH variables Bottom boundary condition Diabatism in NH Vertical discretization in high resolution . Dynamics – other topics Horizontal diffusion (SLHD) – Documentation issued! Radiative UBC Physics/dynamics interface RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  9. Results from WG forDynamics and Coupling Interative scheme (overview)  2TL SL P/C (ICI) scheme has been developed  3TL Eulerian scheme is phased into the CY29T2 • test with DFI (to do: SHLD tests )  3TL semi-­Lagrangian part is still missing Stability tests: Alphia 2TL SL 3TL (ICI) Eul ∆t 80 sec ∆t 40 sec RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  10. Results from WG forDynamics and Coupling Bottom Boundary Condition tests  Residual problems of ALADIN-NH dynamics on resolution (10-100m) - HD Chimney problem  Cure: • To treat exactly the current BBC formulation • To replace spectral HD by SLHD. 2D Tests: Bell shape Exact treatment vis. SLHD RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  11. Working Group forPhysics Development is not frozen AR/AL physics development  ALARO physics • AROME physics RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  12. Working Group forPhysics . PBL cloudiness (Xu-Randall &Seidl-Kann ) . Prognostic cloud water II. Param. schemes, diagnostic tools - 1D TKE prognostic - radiation scheme - convection scheme - DDH diagnostics for ALARO and AROME V. Externalized surface- diffusion in ISBA V. Validation, case and sensitivity studies RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  13. Results from WG forPhysics PBL cloudiness development • Problem: • Too strong 2m temperature diurnal cycle in winter anticyclonic conditions; • Large errors in 2m temperature forecasts. • Convergence Xu-Randall and Seidl-Kann scheme • Critical Humidity Profile computation modified • Lower values for PBL, and ∆T/ ∆Z RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  14. PBL cloudiness RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  15. Results from WG forPhysics AROME Prototype road-map: Target - Feb 2006 • Gravity wave drag parmetrization • Radiation LW and SW • LS precipitation • TKE • Convection • Shallow non-precipitable convection • PBL cloudiness • Interfacing • Sampling; Testing; Porting; Verification RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  16. Working Group forData Assimilation & Predictability . Methods - Algorithmic aspects • Multivariate humidity formulation in the B matrix • L-H versus NMC variances • Ensemble B matrix computation . Observations • MSG/AMV -Atmospheric Motion Velocities data • AMDAR data • Wind profiler data and 10m wind data (SYNOP) • Radar data RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  17. Working Group forData Assimilation & Predictability • LAMEPS • ALADIN EPS based on ARPEGE SV perturbations • Breeding • ETKF -Ensemble Transformed Kalman Filter • ALADIN EPS based on the ECMWF EPS system • EPS post-processing RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  18. Results from WG forData Assimilation Assimilatin of 10m wind data from SYNOP- to improve surface wind assimilation over land - to see the impact of „black-lists“ on asimilation Set-up, surface wind just from SYNOPs: - ALADIN 3D Var Hu, LACE domain, 12km - „envelope orography“ Results: - mostly neutral - „black list“ QC could be replaced by screening 10m RMS orog. vis. real alt RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  19. Results from WG forData Assimilation Downscalling of ECMWF EPS - Meso-scale clustering approach on ECMWF EPS - Several clustering parameters W 700: UV 850 200;Q850 700;RT1000/500, T850,500 - Representatives of clusters as LBC for ALADIN - Set of coupling files from ECMWF EPS /3h freq - ALADIN +5 D forecast - Tests on meso-scale severe weather events RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  20. RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  21. EPS clusters +48;60;72ECMWF ALADIN RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  22. Plans for WG forData Assimilation LACE need for more effort on meso-scale DA at MS (teams, HW, SW, data) • Workshop On Code Maintenance and Data Assimilation (14-18 November, 2005Budapest, Hungary) • ALADIN Meso-scale Predictability Workshop (Jan/Feb/Mar 2006, ?LACE) RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  23. Plans for 2005-2007 General Relations with ALADIN 2 project new MoU (Nov. 2005)- structured ALADIN fresh funds for R&D ALADIN and LACE share the co-ordination mid-term WP (2005-2007) Active in ALADIN-HIRLAM co-operation AROME prototype at MS (spring 2006)  Toward AROME model (2008) 1st AROME WS 21-25 November 2005, Romania RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  24. ALADIN 2 models (AAAA)MF plans, status June 2005 RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

  25. Plans for 2005-2007(LACE) 5th LSC, September 2005:  Better coordination and more funds for predictability (proposed 4th WG)  Proposed extension of current MoU (2006-2007) RC LACE Independent Review in 2006 toward the new goals and structure RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana

More Related